Laserfiche WebLink
Developed Conditions: <br /> Developed Basin Area = 0.38 Acres <br /> Impervious area: <br /> Roof =0.14 Acres( 5,920 SF) <br /> Parking =0.20 Acres( 8,784 SF) <br /> Sidewalk =0.01 Acres( 330 SF) <br /> Total Impervious =0.35 Acres(15,034 SF) <br /> Pervious area =0.38 Acres-0.35 Acres =0.03 Acres <br /> Bypass Basin = 0.06 Acres <br /> Impervious area: <br /> Frontage Sidewalk =0.05 Acres (2,392 SF) <br /> Total Impervious =0.05 Acres (2,392 SF) <br /> Pervious area =0.06 Acres-0.05 Acres =0.01 Acres <br /> Refer to the Developed Basin Map & WWHM Report attached later in this section for <br /> more details. <br /> Insight Engineering Co. -Stormwater Site Plan 3/25/2021 <br /> -30- <br />