Laserfiche WebLink
WWHM2012 <br /> PROJECT REPORT <br /> Project Name: Detention Pipe <br /> Site Name: CM Heating <br /> Site Address: 1415, 1411, 1407 Broadway <br /> City : Everett <br /> Report Date: 10/26/2021 <br /> Gage : Everett <br /> Data Start : 1948/10/01 <br /> Data End : 2009/09/30 <br /> Precip Scale: 1.00 <br /> Version Date: 2019/09/13 <br /> Version : 4.2.17 <br /> Low Flow Threshold for POC 1 : 100 Percent of the 10 Year <br /> High Flow Threshold for POC 1: 0 year <br /> PREDEVELOPED LAND USE <br /> Name : Predeveloped Basin <br /> Bypass: No <br /> GroundWater: No <br /> Pervious Land Use acre <br /> C, Lawn, Flat .09 <br /> Pervious Total 0.09 <br /> Impervious Land Use acre <br /> ROOF TOPS FLAT 0.11 <br /> DRIVEWAYS FLAT 0.15 <br /> SIDEWALKS FLAT 0.03 <br /> Impervious Total 0.29 <br /> Basin Total 0.38 <br /> Element Flows To: <br /> Surface Interflow Groundwater <br /> MITIGATED LAND USE <br /> Name : Developed Basin <br /> Insight Engineering Co. -Stormwater Site Plan 3/25/2021 <br /> -31- <br />