Laserfiche WebLink
2. The Implemanlation 01 these ESC plans and the construction, maintenance, replacemanl, and <br />upgrading of these ESC ladiites is the regmnsibildy of Me applicenVwnpa der until all <br />construction is completed and approved and vegetmoNlandscaping Is established. <br />3. The boundaries 0 the cleanup limits shown on this plan Shall be dearly flagged in the held <br />prior to construction. During Me construction period, no disturbance beyond tlg flagged clearing <br />limits shall be promMed. The flagging shall be mafdalted by the appfeanbcontrectw for the <br />duration of conSWcticn. <br />4. The ESC faclllges shown on this plan must be constructed in conjundldn wish all cleaning ant <br />grading SeivNee. and 10 Such a manner he b ensure that widened ned and Sediment laden water do <br />Net enter lire drainage system.roadways, or violate applicable water quality standards. <br />5. The ESC facilities Shown on MIS plan are the minimum requiremenl5 be antcipated $ite <br />conditions, During me construction period these ESC facilities shall be upgraded as needed for <br />unexpected! storm events ant to ensure that Seemed ant Sediment laden water do not leave the <br />site. <br />6. Tie ESC faclllges shall be Invested routinely and maintained by the appllcant/contracmr to <br />ensure Meir centered Neatening, especially after Storm events. <br />].Tie ESC faclllfes on Inactive sites shall be inspected ant maintained a minimum of once a <br />month or within the 43 hours fallowing a major been avers. <br />B. At m Ilona shall more than one foot of sediment thy allowed to accumulate arms a trapped <br />catch basin. All catch basins and conveyance lines shall be cannot prior paving. The cleaning <br />operation shall not flush Sediment laden water into the downstream system. <br />s. Sbglized construction contended shall be installed at the beginning of const lion and <br />paintained for the duration of the project. Additional measures may be required to ensure that all <br />aved areas are kept clean for the duration of the project. <br />10, The Contractor shall provitle periodic street cleaning to remove datum and sediment Sacred <br />Off the site. <br />11, Appropriate measures shall be taken to step seamen tmm entering surface water bodies t <br />the proposed BMPS fall. If BMPs fall and Sediment laden water IS leasing the she, immediately <br />of your Public Wwkn Ingiemar. <br />12. Bare anclor disbursed sells sh it remain uncovered anNor unw adfized for no more than 2 <br />days from Oclebw 1 through April 30, and form micro than ] days man May I through <br />September N. <br />13, Notify the City Public Weeks impeder at land 20 Mu5 prior to dewalerfng activties.Handle <br />highly Wk J or otherwise contaminated dewabrirg water separately from stwmwaler. <br />14. The ammi project Public Works permit and SWEET shall be relain sdon site or readily <br />available to the connector throughout the duration of the construction project. <br />15. Design, Install, Implementand harder effective pollution prevention measures t0 minimize <br />the discharge of pollutants. <br />16. Protect all LIB BMPs from Sedimentation through i rdelato0 cod mabbOdnco of erosion ant <br />sediment well BMPs on Pomona of the site that See imo the LID BMPs. <br />6FCIN66Ra,INC ....reey.�. <br />Mean Mi Me W Us N end areas My <br />Chy d EvereX Permit Pniew <br />EVERM B pus: Approved as Ni <br />0&dNdica 949:I3AM <br />NOTED PORT OF EVERETT run. G1.03 <br />Mn6c„zd>s BOXCAR PARK RESTROOM LIFT deal, 5_a_�_m <br />wfEs. STATION EMERGENCY REPAIRS <br />NOTES - "` PA-W-M-W <br />Sam NP 4 OF <br />