My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1402 PINE ST 2023-09-08
>
Address Records
>
PINE ST
>
1402
>
1402 PINE ST 2023-09-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2023 9:12:00 AM
Creation date
9/7/2023 4:00:20 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
1402
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />C <br />AID <br />2 <br />\ 1 <br />1 �m <br />8 I II J� <br />If <br />1 <br />3 CN�I <br />Ame <br />I �Rfi m� ,S�niu,v 4�w9r <br />v " I� III Ili <br />t I I <br />(I)CONSTRUCTION FENCE <br />' O DEMOLITION LIMITS_, <br />' (TYP) i <br />1 1 <br />5 �11 <br />I 11 `II I <br />DEMOLITION NOTES: IoI I16ll <br />I <br />1 THIS DEMOLITION PLAN ANTICIPATES EXISTING BUILDING STRUCTURES HAVE BEEN <br />I <br />O DEMOLISHED AND DEBRIS REMOVED OFF SITE; THEREFORE THE CONTRACTOR SHALL: IIIP <br />REMOVE ALL EXISTING SURFACE IMPROVEMENTS AND UTILITIES WITHIN THE DEMOLITION <br />UNITS, UNLESS NOTED OTHERWISE. THE DEMOUTION LIMITS BOUNDARY IS AN ESTIMATE <br />THAT EXPANDS FARTHER BASED ON SAWCUT LINE REQUIREMENTS FOR UTILITY ' <br />INSTALLATIONS. THE CONTRACTOR SHALL FIELD VERIFY AND ACCOUNT IN THE BID <br />ACCORDINGLY. HAUL ALL DEMOLISHED MATERIALS OFFSITE IN A LEGAL MANNER. 1' <br />COORDINATE WITH THE OWNER AND THE ARCHITECT FOR ANY MATERIAL SALVAGE. <br />O2 INSTALL MAINTAIN AND MODIFY TEMPORARY CONSTRUCTION FENCE AS NEEDED TO <br />ACCOMMODATE PROJECT DEMOLITION AND CONSTRUCTION ACTIVITIES. _ a <br />O3 PRIOR TO CAPPING UTILITY, VERIFY AND REROUTE ACTIVE EXISTING UTILITY SERWCES <br />COMING FROM ADJACENT PROPERTIES TO ACCOMMODATE ALL EXCAVATION AND <br />CONSTRUCTION ACTIVITIES. �cl <br />® PROTECT EXISTING STRUCTURE TO REMAIN IN SERVICE. PLUG INLETS PER CITY OF II <br />EVERETT REQUIREMENTS AS SHOWN IN PLAN. ; S <br />O5 PROTECT AND MAINTAIN PORTIONS OF THE EXISTING STORM AND SEWER SYSTEMS FULLY I <br />OPERATIONAL UNTIL THE PROPOSED SYSTEMS OR TEMPORARY BYPASS SYSTEMS ARE <br />I <br />INSTALLED. AFTER THE INSTALLED PROPOSED OR TEMPORARY BYPASS SYSTEMS ARE \ <br />FULLY OPERATIONAL, THE EXISTING STORM AND SEWERS SHALL BE TAKEN OFFLINE NA cI <br />CAPPING AND PLUGGING OPERATIONS AND THEN THE EXISTING STORM AND SEWER <br />SYSTEMS WITHIN THE PROJECT SITE SHALL BE DEMOLISHED, UNLESS NOTED OTHERWISE. y� <br />© PROTECT EXISTING UTILITY SYSTEM PIPING TO REMAIN IN SERVICE, EXISTING UTILITY I " <br />SYSTEMS INCLUDE GAS, SEWER, WATER AND STORM WATER. <br />Oj PROTECT EXISTING FIRE HYDRANT(S) UNTIL PROPOSED FIRE HYDRANTS ARE OPERATIONAL Ihr <br />THEN REMOVE EXISTING FIRE HYDRANTS AND CAP AT THE PRIVATE MAIN. \I 6 <br />® COORDINATE THE REMOVAL OF EXISTING OVERHEAD POWER LINES, POWER POLES AND <br />STREET LIGHTS WITH THE SNOHOMISH COUNTY PUD AND WITH RESPECTIVE UTILITY <br />PURVEYORS FOR ALL OTHER OVERHEAD CABLES.. <br />wcT <br />I <br />a I III <br />c�P w✓x v S I1111 <br />a I llll <br />v 6 v v v a4 I M I I n <br />i I <br />31 <br />' J4) <br />%F <br />3 i <br />11xn T�9 �� I <br />II <br />C <br />8 II \ 1uP . r y l IT� 5 LI <br />ga y�.a. I II q I N 14 I I II <br />,ur <br />„1".ri I <br />ri <br />I III I 11 I:, ate^ p$ I I f I I <br />cl y FE <br />ma^ <br />� III II I, rI b. 9^gym) AI — <br />I <br />I 1 I 1 <br />I I I I <br />hI B III I I �� I �°I Il lljl <br />1 <br />� Ifs II i � I I I II II <br />— <br />I <br />III J V I I I I II I d'a I <br />F4 <br />\ I <br />I <br />I I \ I I I+ I <br />I I � III I I I I <br />I <br />III' m � i Illlll l <br />I I I III <br />III <br />II II I j"ih I I I I>+ I <br />a� �`E�E,, <br />1 -:3 III I 8m } <br />4 I 'u8l II III .? c4YD'J <br />�5�uy 4II il�lil� 5 z � <br />RAGS/NEWSPAPER/DEBRIS <br />TO PREVENT <br />CONCRETE PLUG FROM SEEPING INTO EXISTING <br />SEWER SYSTEM REMAINING <br />IN SERVICE <br />\ <br />6" CONCRETE PLUG <br />CAPS <br />i <br />%waars,w <br />". <br />SEWER MAIN TOO <br />REMAIN IN SERVICE <br />O EXISTING SANITARY SEWER MAIN <br />— <br />1 <br />TO REMAIN IN SERVICE SHALL BED <br />PROTECTED THROUGHOUTDUR <br />RAGS/NEWSPAPER/DEBRIS <br />TO PREVENT <br />OF THE PROJECT. <br />THE RAINING SEWER MAIN <br />THE REMAINING <br />CONCRETE PLUG FROM SEEPING INTO EXISTING <br />SHALL BE CLEANED AND <br />SEWER SYSTEM REMAINING <br />IN SERVICE <br />RETROFITTED PER THE SANITARY ,r 6" CONCRETE PLUG <br />SEWER PLANS. <br />R CAP <br />CAP & PLUG DETAIL <br />FOR SANITARY SEWER SYSTEM <br />NTS <br />\ <br />i <br />1 \ II 11 11 I <br />\ \ \\ 1 II I <br />\ <br />I I1\ <br />I <br />\ <br />I <br />1 <br />D 1 <br />AWCU(1 �N I \ Y <br />w� <br />2 1 3 <br />4 5 <br />GENERAL DEMOLITION NOTES: <br />1. RESIDENTIAL STRUCTURES AND FOUNDATIONS WITHIN THE DEMOLITION <br />LIMITS HAVE BEEN REMOVED AND SERVICE UTILITIES CAPPED UNDER <br />BUILDING DEMOLITION PLANS. CONTRACTOR SHALL REVIEW ABATEMENT <br />AND DEMOLITION CONTRACT DOCUMENTS AND SCHEDULES TO ENSURE <br />THE ABOVE WAS COMPLETED AS INDICATED OTHERWISE ANY <br />REMNANTS WILL BECOME PART OF THIS DEMOLITION PLAN. <br />CONTRACTOR SHALL COORDINATE THEIR DEMOLITION SCHEDULE <br />ACCORDINGLY. BELOW GRADE UTILITIES REMAINING ON THE PROJECT <br />SITE AND SHALL BE DEMOLISHED, PER THESE NOTES. <br />2. CONTRACTOR TO COORDINATE TREE PROTECTION WITH OWNER'S <br />REPRESENTATIVE. CONTRACTOR IS RESPONSIBLE FOR THE TREE <br />PROTECTION AND THE HEALTH OF THE TREES FOR THE DURATION OF <br />� <br />q I\ REFER TO WATER UTILITY PLANS THE PROJECT. <br />I FOR RECONNECTION OF EXISTING 3. ALL EXISTING SURFACE FEATURES REMAINING WITHIN THE DEMOLITION <br />\, WATER MAIN PRIOR TO CAPPING LIMITS SHALL BE REMOVED IN THEIR ENTIRETY, UNLESS OTHERWISE <br />AND DEMOLISHING EXISTING WATER NOTED. <br />MAIN PIPE THROUGHOUT THE SITE. <br />a•m roE a�;. 1 I 4. ALL ASPHALT AND CONCRETE RUBBLE GENERATED BY DEMOLITION <br />\ <br />ACTIVITIES SHALL BE REMOVED AND RECYCLED IN A LEGAL MANNER. <br />5. ALL UTILITY STRUCTURES SHALL BE REMOVED FROM WITHIN THE <br />DEMOLITION LIMITS IF RIM TO INVERT IS 5 FEET OR LESS. FOR <br />r ¢ \ UTILITY STRUCTURES DEEPER THAN 5 FEET FROM RIM TO INVERT, <br />DEMOLISH AND REMOVE THE TOP 5 FEET OF THE STRUCTURE AND <br />FILL WITH CDF, UNLESS OTHERWISE NOTED. ASSOCIATED PIPES SHALL <br />1 ' •I \ BE CAPPED TO PREVENT THE MOVEMENT OF GROUNDWATER. <br />5 3 11 II I 1 ' EXCAVATION SHALL BE BACKFILLED WITH COMPACTED STRUCTURAL <br />M I I ^^ FILL. <br />II sm' 3 i i 6. ALL WATER VALVES, POWER AND COMMUNICATION VAULTS/HANDHOLES <br />V ENCOUNTERED WITHIN DEMOLITION LIMITS SHALL BE REMOVED AND <br />€'I I DISPOSED OFF -SITE IN A LEGAL MANNER. <br />REMOVE EXISTING WATER <br />II VAULT AND MASTER C 7. EXISTING UTILITY PIPES 8"0 AND GREATER INTERCEPTED BY <br />1\ METER AND RECONNECT $RAF - TRENCHING OPERATIONS SHALL BE GROUTED BOTH SIDES OF TRENCH <br />I MAIN TO EXISTING CITY TO PREVENT THE MOVEMENT OF GROUNDWATER. <br />MAIN. REFER TO WATER / <br />UTIUTY PLAN. I `; r 8. ALL PRODUCTS OF DEMOLITION ACTIVITIES SHALL BE REMOVED AND <br />it i i I I i II LEGALLY DISPOSED OF OFF -SITE. ASPHALT AND CONCRETE SHALL BE <br />I I RECYCLED OFF -SITE. <br />1q)ff <br />16015th Avenue, Suite 16D0 <br />Seattle, WA 98101 <br />206.622.5822 <br />www.kpf.com <br />03/30/2021 <br />PROJECT: <br />BAKER HEIGHTS LEGACY <br />EVERETT <br />HOUSING AUTHORITY <br />9. ALL UTILITIES AND ASSOCIATED STRUCTURES SHOWN TO REMAIN PROJECT ADDRESS: <br />SHALL BE PROTECTED BY CONTRACTOR. ALL UTILITIES AND BUILDINGA:271014thSTREET <br />6I 1 i STRUCTURES SHOWN TO BE DEMOLISHED/ABANDONED SHALL BE PER BUILDING B: 272515th STREET <br />RESPECTIVE UTILITY JURISDICTION REQUIREMENTS. BUILDING C: 2815151th STREET <br />vv ii i 7 I I� BUILDING D: 281014th STREET <br />1 i III III 10. A PERIMETER CHAIN LINK CONSTRUCTION FENCE WAS INSTALLED EVERETT, WA 98201 <br />III i DURING THE BUILDING DEMOLITION CONTRACT. DEMOLITION OWNER: <br />III ) I CONTRACTOR SHALL INHERIT THIS FENCE AND MAINTAIN IT THROUGH EVERETT HOUSING LEGACY LLLP <br />I I I I I THE CONSTRUCTION PERIOD AND ADD ANY ADDITIONAL FENCE AND <br />NI — II r 11 I EVE COLETT, WAVENUE <br />AS NEEDED. CONTRACTOR TO LEAVE INSTALLED FENCING IN EVERETT, wA sa2D1 <br />1 \ \ I x I I I Iw ; GOOD WORKING CONDITION. TESC MEASURES SHALL BE REMOVED <br />\ 6 OIEC EXISTING O' AFTER GROUND HAS BEEN STABILIZED, UNLESS NEEDED BY FURRIER <br />EE LIGHT FOR III R EEnn CONSTRUCTION OR REQUIRED BY COE INSPECTOR. <br />II�I1 RLO 11 <br />z 11. ALL UTILITY PIPES 8 INCHES OR GREATER IN DIAMETER AND LOCATED <br />BELOW BUILDING AREAS MAY BE LEFT IN PLACE PROVIDED THEY ARE <br />vI I I v ICI �I ""'m•" ��"`v i 1 FULLY GROUTED. ALL UTILITIES LESS THAN 8 INCHES IN DIAMETER <br />1 \ III I AND LOCATED BENEATH BUILDING AREAS MAY BE LEFT IN PLACE <br />1 <br />\ I I I I <br />I PROVIDED THEY ARE CAPPED AND OR PLUGGED WITH GROUT. UTILITY <br />DESCRIP <br />TION <br />PTION <br />1 I yl I PIPES ENCOUNTERED OUTSIDE OF BUILDING AREAS DURING MARK DAM <br />11 I1; 5 i l l i �I _ I REDEVELOPMENT ACTIVITIES SHOULD BE PLUGGED, CAPPED, OR a REVISIONS <br />REMOVED TO PREVENT MOVEMENT OF GROUNDWATER. <br />\\ 1 1 ' 12. ANY UTILITIES DISCOVERED DURING CONSTRUCTION OPERATIONS SHALL K 0=021 C.MFORMEUSET <br />\ 11\ /III _I 6 lu 1 BE REMOVED TO A POINT, 3 FEET BELOW FINISH GRADE. THE UTILITY J Ov1=1 ADDPNOUMxs <br />\ 111 j j>h SHALL BE CAPPED OR PLUGGED WITH GROUT TO PREVENT THE H rolvlPnvn AnncunllMm <br />MOVEMENT OF GROUNDWATER. ABANDONED UTILITY LINES UNDER <br />> III j II! I I PROPOSED BUILDINGS SHOULD BE IDENTIFIED DURING CONSTRUCTION G 10MIM90 Amhlni IMm <br />\ IIIIIj �.• �x3 j?I� II, AND EXISTING TRENCH BACKFILL SHOULD BE REMOVED AND REPLACED E Ooo 23 MNSTRIllSET ) nnA cNnll_ #1) <br />I I l 111 8 PER RECOMMENDATIONS OF THE GEOTECHNICAL REPORT. E n»n5nronm n PERMIT <br />5 5 <br />13. CONTRACTOR IS RESPONSIBLE FOR CONTINUED OPERATION OF n nelzvzngO BIn sPT <br />EXISTING AND TEMPORARY STORM SYSTEMS. CONTRACTOR SHALL C ill RnllnxnPERMTSIMMITTAII <br />REVIEW AND FIELD VERIFY THAT THE REMAINING PORTIONS OF THE HUDSUBMITAL <br />EXISTING STORM DRAINAGE SYSTEM WITHIN THE RIGHT OF WAY, a aamnozD DESIGN DEVELOPMENT <br />TEMPORARY STORM MEASURES AND PROPOSED GRADING ARE NOT IN <br />1 1 1 I 1 � I 1 CONFLICT. WHERE CONFLICTS OCCUR, CONTRACTOR SHALL PROVIDE A 011ID70 0 SCHEMATIC DESIGN <br />�� TEMPORARY PUMPING OR ALTERNATIVE SYSTEMS. MARK DATE DESCRIPTION <br />} ISSUE INFORMATION <br />14. CONTRACTOR SHALL PREPARE A COLOR CODED RECORD PLAN NOTING <br />1 1\ \ I PLUGGED/ABANDONED/REMOVED UTILITIES FOR USE BY THE SITE cC <br />III "i➢ii'' InL -` _ DEVELOPMENT AND BUILDING CONTRACTOR'S TO COORDINATE, PLAN, PROJECT NO.: 1700658 <br />AND SCHEDULE THEIR CONSTRUCTION EFFORTS ACCORDINGLY. GGLOPRINCIPAL INCHARGE: AGc <br />I l I I I l GGLOPROJECTM4JAGER LESISJZ <br />1 A \ 1 PE I ' 1 OWNERAPPROVAL: <br />cwc \ u 1 ?A, I I I CV <br />o <br />N A <br />\ h N SHEETTITLE <br />N m; SITE DEMOLITION <br />LU <br />y <br />LU <br />SHEET NO. <br />0 15 30 f>D Z C=200 <br />o <br />1 inch = 30 feet <br />'a"wpxu`snei�Nais`xv"�.n <br />4 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.