My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 23RD DR W ZAP ENERGY 2023-10-23
>
Address Records
>
23RD DR W
>
5901
>
ZAP ENERGY
>
5901 23RD DR W ZAP ENERGY 2023-10-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 9:42:57 AM
Creation date
9/8/2023 12:05:46 PM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5901
Tenant Name
ZAP ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
¶u/19r ,•4:07 PM https://waenergycodes.com/print_project_summary_form.php?k=aWQ9MTM5OTAmZnZpPTE4JmN0aT0=&print=1 <br /> 40 ,/ °, IANCE SUMMARY <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI Administered by:©2022 NEEA,All rights reserved <br /> Project Title ZAP Energy tenant improvement-2018 WSEC For Building Department Use: I Date• Oct 19,2022 <br /> 5901 23rd Dr.W. <br /> Project Address 100 <br /> Project&Applicant Everett,WA 98203 <br /> Information Applicant Name Tom Grifl-m <br /> Applicant Phone 425-317-8017 <br /> Applicant Email tom@caparchgroup.com <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waencrgycodes.com <br /> General Occupancy All Commercial General Building Use Type _ Industrial Building Cond.Floor Area 6,293 <br /> New Building or Project Cond.Floor Area 616 <br /> Alteration <br /> General Project Types Building Addition Addition Interior Lighting Lighting Scope Floors Above Grade 1 <br /> Lighting Scope Compliance Method Compliance Method 1-General <br /> Lighting Project Description <br /> Type Interior/Exterior Luminaire Replacement Scope Compliance Method LPA Calculation Compliance Verification <br /> Lighting Compliance Scope Project (Interior includes both interior&parking) p pAdjustment p <br /> and Method Building Addition Interior Lighting Space by space No Calculation Adjustments selected COMPLIES <br /> Additional Efficiency <br /> Options Included <br /> ZAP Energy tenant improvement-2018 WSEC <br /> Lighting Power Calculation BUILDING ADDITION-INTERIOR LIGHTING °' ompliance Verification COMPLIES <br /> Compliance Method Space by space LPA Calculation Adjustment none <br /> Interior Lighting Power Allowance-Space by Space <br /> Ceiling Total Watts Allowed Total Proposed Watts <br /> General Space Type Specific Space Type Height(Ft) Gross Interior Area(SF) LPA(Watts/SF) (SF x LPA x 1) (LPD+Display LPD) Compliance Status <br /> Workshop 593 1.26 747 <br /> Proposed Total LPD 240 <br /> Totals 747 240 COMPLIES 0 <br /> Proposed Lighting Power Density <br /> 'Watts or Total'Watts <br /> Fixture Type Fixture ID Quantity of Wattage Limit Total Linear N\'atts per Linear Proposed <br /> Fixtures(#F) per Fixture Feet(LF) Foot(WpLF) (#F x WpF)or <br /> (WpF) (LF x WpLF) _ <br /> Individual Fixtures <br /> l-Iorizontalsurface-mount L-1 8 30 240 <br /> Proposed Total LPD 240 <br /> Project Title ZAP Energy tenant improvement-2018 WSEC Date Oct 19,2022 <br /> Proposed Fixtures Details BUILDING ADDITION-INTERIOR LIGHTING <br /> Fixture Type/Application Fixture ID Location in Documents I Lamp Type New or <br /> Existing-to-Remain <br /> Individual Fixtures _ ____ <br /> Horizontal surface-mount I I A-2.2 1 LED New <br /> https://waenergycodes.com/print project_summary_form.php?k=aWQ9MTM5OTAmZnZpPTE4JmN0aT0=&print=1 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.