Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2203-234 Description: installing furnace <br /> Applied:3/29/2022 Approved:3/29/2022 Site Address:6019 MERIDIAN AVE <br /> Issued:3/30/2022 Finaled:9/11/2023 City,State Zip Code:EVERETT,WA 98203 <br /> Status: FINALED Applicant:WASHINGTON ENERGY(ELEC)SVCS CO LLC <br /> Parent Permit:M2203-113 Owner: LENSVELT LUKE&LANA <br /> Parent Project: Contractor:WASHINGTON ENERGY(ELEC)SVCS CO LLC <br /> Details: <br /> installing furnace <br /> installing furnace <br /> us MN <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PERMIT EXTENSION SHARON EXTENSION <br /> 8/28/2023 8/28/2023 (REASON GILFEATHER APPROVED <br /> REQUIRED) <br /> Notes: <br /> From:Luke Lensvelt<luke@themilestonescoach.com> <br /> Sent: Monday,August 28,2023 12:46 PM <br /> To: Permit Services<PermitServices@eve rettwa.gov> <br /> Subject:Re: [This Email Is From Outside our Company] [SPF ERROR] RE: [EXTERNAL] permit/inspection assist please <br /> Hi Sheyenne, <br /> Ok thank you.I will give them a call and see what time their last stop normally is.What is the best number to call them on?I will see if the tenant will be <br /> available before4pm otherwise I may need to arrange for someone to open up on my behalf. <br /> Thank you for your help! <br /> On Thu,Aug 24,2023 at 9:42?AM Engineering/Public Services(PW)<evteps@everettwa.gov>wrote: <br /> Category 2:Sensitive information <br /> Karen&Luke, <br /> I can get it on the schedule for 9/8 with a note for PM preferred,but I think the inspectors are typically back in the office by that time.What I would <br /> recommend is calling the morning of and just requesting their last stop and let them know it needs to be as late as possible. <br /> If you'd like,you can also contact them sooner and see what their typical last stop timeframe looks like. <br /> I will go ahead and get the inspection on for 9/8 in the meantime.Let me know if we need to change it at all to accommodate.Can I also please get a <br /> good contact name and phone number to put on the appointment? <br /> Thank you, <br /> *As of 8/28/2023,I will be out of the office on extended leave with no access to email or phone.I anticipate my leave to carry through the end of the <br /> I <br /> Printed: Monday, 11 September, 2023 1 of 4 rk <br /> SUPERION <br />