Laserfiche WebLink
PUBLIC WORKS PERMIT <br />Date Applied: <br />5/10/2023 <br />City of Everett Permit Services <br />Public Works Permit k: <br />PW2305-00S <br />3200 Cedar Street, 20 Floor <br />Associated Bldg Permitk: <br />EVERETTEverett, <br />WA 98201 <br />Planning Reference ll: <br />everettwa.eov/permits <br />Public Works Fee: <br />$140.00 <br />WASHINGTON <br />PermitSeryiceskl eyerettwa.eoy <br />Schedule Inspections at: onlineoermils.everettwa.ew <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />BOVEY JONATHAN A & TIERRA DAN BOVEY <br />2706 TAYLOR DR <br />EVERETT, WA 98203-1452 <br />PHONE: PHONE: 4253536777 <br />SITE ADDRESS: 2706 TAYLOR OR TAX PARCEL ID IF: o041740o0o0501 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: IMPORT IN R MATERIAL TO GRADE W/ TRAROR <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at hays ://onlinenermitseverett my Available inspection dates are shown in the Goodman menu. <br />2. All work shall be performed In accordance with the pernat and current City of Everettmesign and Construction Standards and Specifications for <br />Developmene. <br />3. Call Location Underground Service 48 hours before You dig. The day You call does not count. TOLL FREE NUMBER 611. <br />4. Site Civil Work to be done Per plans approved by the City of Everett Public Works Department. Approved plans must remain an jolesite at all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at onlinepermits.everettwa.gav to formally request <br />all required inspections. <br />6. Instill and maintain erosion control measures per City Everett Standards and per the direction of the PW Inspector and the approved <br />SWPPP/TESC Plan. Remove upon Completion of are project prior to final approval of the permit. <br />T. Keep City streetsclean at all times No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities all construction. <br />9. Any damage to City Improvements lsidewalk, curb, roadway,eta.) shall be replaced per Cry Standards and/or As directed by the Clry PW Inspector. <br />10. It is the appliranVowmeh responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed onsite in a <br />manner that does not adversely affect neighboring properties, including the City dgbtof-way and/or easements and the improvements located <br />the.em. <br />11. Prior to any interruption to the public right-of-way lroadways, Parking lanes, or sidewalks) a Traffic Street Use Permit shall be obtained from the <br />Citys Traffic Engineering Division. This permit can be applied our online at onllnepermits.everettwa.gov and requires a traffic control plan to be <br />submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />II. This permit must be finaled in order to Close out this Permitflryuest a final inspection online by selecting PW 25-Siff Final/Permh Close Out within <br />the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br />13. All work constructed within the public right -of way must be removed or relocated at the owners expense if the City ever requires uu of the right- <br />of-way for municipal purposes. <br />PERMIT FEE BREAKDOWN: <br />Erosion Control $50.00 <br />Grade/Fill(100 CY) $50.00 <br />PW Plan Review $20.00 <br />PW Site Inspection $20.00 <br />ACKNO W IEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to bold and save harmless the City of Everett from any and <br />all claims for damages, costs, expenses, or causes of action that may arise because W installation and maintenance W the improvement or other <br />rigM-ohway use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged <br />thereby. <br />VAUDITY/EXPIRATION: <br />Work authorized by this permit must be started within IN days of date permit B Bsued and thereafter is m be diligently pursued to completion. <br />This permit may be canceled by the city upon any stoppage of work on this project over= -day duration. Each inspection extends the expiration <br />date IN days to keep the permit open while work is actiae. <br />Page 1 of 1 <br />_APPucAm//OBSITECOPY _NDi NLE _TREAsuam <br />