Laserfiche WebLink
CITY OF EVERETT <br />PROPERTY - <br />PORT OF EVERETT PROPERTY <br />• • <br />ADC PROPERTY <br />5 Boring locations <br />shown on BNSF <br />Property are <br />proposed to be <br />moved to Everett <br />ROW. <br />BNSF PROPERTY <br />APPROVED <br />PUBLIC WORKS DEPARTMENT <br />BY: TJorgenson <br />DATE: NIIO12021 <br />CITY OF EVERETT REVIEWED FOR PERMIT <br />-- / _ -0 Port of Everett - Proposed Soil Boring <br />i <br />Everett ROW - Proposed Soil Boring <br />j • ADC - Proposed Soil Boring <br />EXXONMOBI� <br />PROPERTY • ExxonMobil - Proposed Soil Boring <br />> Approximately SO borings alternating on 20' grid <br />> All borings to 12.5' bgs or deeper pending field observations <br />> Approximately 7 to 10 working days <br />> Select borings may need subsurface clearance based on <br />proximity to utilities <br />FN 0314470002 <br />EXPLANATI <br />• Proposed APPROXIMATE SCALE <br />o ao Bo <br />Feet <br />PROPOSED EXCAVATION PROJECT NO. <br />DELINEATION MAP - 40 FOOT SPACING 031"7 <br />U� Cardno' EX ONMOBILADC PLATE <br />271712731 Federel Avenue 1 <br />Everett, Washhg[on <br />