Laserfiche WebLink
From: Thad Newport <br />Sent: Wednesday, November 25, 2020 9:55 AM <br />To: ISMAIL.SEATTLE@GMAIL.COM <br />Cc: Grace Pollard <br />Subject: B2005-035 3308 ROCKEFELLER AVE Public Works Comments <br />Attachments: 6-10 Combined Sewer Requirements.pdf <br />Ismail, <br />I have reviewed the revised site plan submitted on 11/18/2020 and have the following comments <br />requiring corrections. If you have any questions please let me know. <br />This project is in the combined storm/sewer basin and looks to be adding more than 200 square <br />feet of hard surface area. As such, this project will need to meet the flow control requirements <br />outlined in Section 6-10 of the City of Everett Design and Construction Standards and <br />Specifications (attached). An Engineer will need to prepare a report and BMPs will need to be <br />added to the site plan addressing drainage for the new paved area. <br />— .`Y� Thad Newport <br />Associate Engineer I Permit Services <br />425.257.8810, Option 6 1 3200 Cedar Street, 2nd Floor, Everett, WA 98201 <br />EVERETT ' ���� Phone Hours: M/W/Th: 8 a.m. —12 p.m & 1 p.m. — 3 p.m. <br />everettwa.gov I Facebook I Twitter <br />COVID-19 Update: Please reference our website & online resources for updates to our service <br />during the COVID-19 pandemic. We are currently experiencing a higher volume of calls and <br />emails and have limited staff available to respond. Your patience is appreciated as we respond <br />in the order received. <br />Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant <br />to the Public Records Act. <br />