My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4514 SEAHURST AVE 2023-10-23
>
Address Records
>
SEAHURST AVE
>
4514
>
4514 SEAHURST AVE 2023-10-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 8:59:22 AM
Creation date
9/11/2023 8:17:07 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
4514
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 0 5 of 24 <br /> GENERAL NOTES <br /> CONCENTRIC/DRIVEN PILES <br /> 1. "CONCENTRIC" OR DRIVEN PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2015 <br /> INTERNATIONAL BUILDING CODE(IBC). <br /> 2. IT IS RECOGNIZED THAT THE SEATTLE BUILDING CODE(SBC) REQUIRES 8 INCH MINIMUM DIAMETER PIPE FOR PIPE <br /> PILE INSTALLATION'. THE APPROPRIATE ANAL I/SIS/EVALUATION AND TESTING II' 1f\ 4 JIRE VIE NTS IN ACCORDANCE <br /> WITH SEATTLE DEPARTMENT OF CONSTRUCTION &INSPECTIONS(SDCI) DIRECTOR'S RULE 10-2009 ARE PROVIDED <br /> TO ALLOW FOR USE OF PILES LESS THAN 8 INCHES IN DIAMETER AS REQUIRED BY SECTION 104.5 OF THE SBC. <br /> 3. DRIVEN PILES SHALL BE DESIGNED AND MANUFACTURED BY STABIL-LOC SYSTEMS, LLC,AND SHALL BE IN <br /> ACCORDANCE WITH ESR-4121. <br /> 4. ALL MATERIAL PROPERTIES OF DRIVEN PILE COMPONENTS SHALL COMPLY WITH ESR-4121. <br /> 5. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR <br /> CORROSION PROTECTION OF STEEL FOUNDATION USING POL <br /> iMrK(EA A)COATINGS <br /> ( n <br /> 6. ALL PILE COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING STEEL, BUILDING <br /> STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER AC358 SECTION 3.9. <br /> 7. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. <br /> 8. ONLY MANUFACTURER-APPROVED CONNECTORS,ADAPTORS,AND ACCESSORIES MAY BE USED. <br /> 9. DRIVEN PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION <br /> OF 1 DEGREE FROM VERTICAL PER SECTION 5.7 OF ESR-4121. <br /> 10. DRIVEN PILES SHALL BE INSTALLED TO THE MINIMUM FORCE REQUIRED TO PROVIDE THE MINIMUM REQUIRED LOAD <br /> CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO(2).THE MAXIMUM <br /> INSTALLATION FORCE SHALL NOT EXCEED THE ALLOWABLE CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE <br /> ASSEMBLY. <br /> 11. ALL BRACKETS AND PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM <br /> REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO(2). <br /> 12. THE PILE QUANTITY, LAYOUT,AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN <br /> APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTAL' ATM. <br /> 13. SPECIAL INSPECTION IN ACCORDANCE WITH IBC SECTION 1705.7 IS REQUIRED FOR INSTALLATION OF THE STABIL- <br /> LOC FOUNDATION PIERING SYSTEM.A GEOTECHNICAL SPECIAL INSPECTOR MUST VERIFY AND RECORD THE <br /> FOLLOWING: <br /> A. VERIFICATION OF MANUFACTURER PRODUCT MODEL NUMBERS <br /> B. TYPES, CONFIGURATIONS,AND IDENTIFICATIONS OF HYDRAULICALLY DRIVEN STEEL PIER SEGMENT <br /> AND ADJUSTABLE HEAD ASSEMBLY AS SPECIFIED IN ESR-4121 AND THE CONSTRUCTION DOCUMENTS. <br /> C. INSTALLATION PROCEDURES,ANTICIPATED AND ACTUAL PILING DEPTH <br /> F\I TIO1 In I ST S1 F <br /> D, Tit'EL_vA:l��,y` T_i-iF IILi1.Al I_G:!L!!9 PRESSURE FjNF+i i I�i+T�i-i OF 1i-ir i Ii�i�ir� FOUNDATION <br /> SYSTEM <br /> E. INCLINATION AND POSITION/LOCATION OF HYDRAULICALLY DRIVEN PIER SEGMENTS <br /> F. COMPLIANCE OF THE INSTALLATION WITH THE APPROVED CONSTRUCTION DOCUMENTS AND THIS <br /> EVALUATION REPORT. <br /> 14. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT,OR FAILURE TO MEET OTHER <br /> SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE.ABANDON REJECTED PILES AND INSTALL <br /> ADDITIONAL PILES AS REQUIRED. <br /> DRIVEN PILE PROOF TESTING <br /> THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE(3) PERCENT OF <br /> PILES UP TO FIVE(5)PILES MAXIMUM(ONE(1)MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM <br /> D1143 AND/OR THE 2015 SEATTLE BUILDING CODE(SBC).THE MAXIMUM TEST LOAD SHALL BE TWO-HUNDRED(200) <br /> PERCENT OF THE SPECIFIED DESIGN LOAD. <br />