Laserfiche WebLink
Material on hand like <br />sand bags, wattles etc.. <br />in case of rain events <br />while soil is exposed. <br />Element ye the Project: <br />P CISO. Molestation <br />eterlals On Hand <br />❑ BMPC160:C difladEroslonandSedlmentUntrolLead <br />(CESCL not required on-Chefor sizes<lsne) <br />❑ BMP C162: Scheduling <br />❑/pµer PertheSWMMWW. <br />21Not applicable to my proposed p/r lech <br />Explain: IleI..,, 5 HA /1✓ne2� <br />Element 13. Protect bw Impact development: <br />❑ BMP C102: SufferZones <br />❑ BMP C103: High Visibility Plastic or Metal fence <br />❑ BMPC2W: Interceptor Dikeand Swale <br />❑ BMP C207: CbeckDams <br />❑ BMP C201: Triangular Slit Dike (Geotextile Encased Check Dam) <br />❑ BMP C231: BrushBarrier <br />❑ BMP C233 SIBPence <br />❑BMP C23I Vegetated Stdp <br />❑ OtOtherPertluSWMMWW: <br />LYNot applicable to myProposed project <br />Explain: Non 11 CI� <br />I <br />•Task 3: Construction SWPPP drawings <br />Provide a Temporary Erosion and Sediment Control (TESCI plan for your project. <br />IS Shaw on yourTESC Plan all BMPsselected above0o satisfythe 23 Elements on your <br />TESCPbn. <br />0 See City of Everett Public Works StadeN Pan 103-TESC Plan Example <br />evererwoacrofDocumenRenterAnew/ D <br />Note. Ca emetianSMrm"WPollutronPmmOonPons(CwstructbnSWPPPs)dlat <br />involve engineering calculations mustbepmpamdby orunderthe camel We <br />Washington Slate professional licensedenguseer. <br />iiiiiiiiiiiix <br />CAI / of Emoft P,nx Waas <br />:Non$IwfWutim PmenLM Pkn 6of6 <br />SVVPPP) remYanfix <br />SmYlPM1yen9 <br />