My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2821 RUCKER AVE 2023-09-11
>
Address Records
>
RUCKER AVE
>
2821
>
2821 RUCKER AVE 2023-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2023 9:04:57 AM
Creation date
9/11/2023 8:55:00 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2821
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT <br />Date Applied: <br />11/30/2021 <br />City of Everett Permit Se ry Ices <br />Public Works Permit#: <br />PW2111-062 <br />EVERETT <br />3200 Cedar Streeq 2^^ Floor <br />Everett, WF 98201 <br />Associated Bldg Permt#: i <br />Planning Reference <br />WASHINGTON <br />425-257-8810 <br />Public Works Fee: <br />$130.53 <br />OWNER NAME ANDADDRESS: <br />APPUCANT NAME AND ADDRESS: <br />RUCKER PROPERTIES HMB LLC <br />HOWIE BARGREEN <br />2821 RUCKER AVE <br />EVERETT, WA, 98201 <br />PHONE: <br />PHONE: 4257 09336 <br />TAX PARCEL ID IN ON3916690MOO <br />SITE ADDRESS: 2821 RUCKER AVE <br />DESCRIPTION: ME (3) EXTG DOWNSPOUTS TO (1) WHICH DRAINS INTO CITY PIPES <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMDCONDITIONS: <br />1. All calls for inspection shall be made 24 hours In advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br />for Development'. <br />3. Call Location Underground SelvkLI 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department. Approved plans must remain on job -site at <br />all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br />required inspections. A handout is provided at permit issuance with instructions on haw to request an inspection online. <br />6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector or the approved <br />SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br />T. Keep Cry streets clean at all times. No dirt, mud, racks, or debris to be tracked onto roadway. <br />S. Protect all existing underground utilities during construction. <br />9. Any damage to City improvements (sidewalk, curb, roadway, LIFE.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />10. D is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will nemanaged on - <br />site In a manner that does not adversely affect neighboring properties, Including the City's right-of-way, and/or easements and the <br />improvements located therein. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained <br />from the City's Traffic Engineering Division. This permit can be applied for online at pweverettwaRov, and requires a traffic control plan to he <br />submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />12. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br />selecting PW 25-Site FInaVPermit Close Out within the Online Permitting Portal Inspection Requests for this permit when all Items have been <br />completed. <br />12. All work constructed within the public right-of-way must be removed or relocated at the owners expense if the City ever requires use of <br />Me right-of-way for municipal purposes. <br />Public Works PermN Fee Breakdown: <br />Paving(170SF).............................................$45.00 <br />PW Plan Review ..................................... ..... $20.00 <br />FEW Site Inspection.................... .................. $20.00 <br />Stormwater System Development Fee ........ $45.53 <br />City of Everts Official Use Only ACKNOW LEDGE MENT OF CON ORIONS <br />By purchasing this permit and commencing work, the owner/appliaat <br />hereby agrees to hold and save harmless the City of Everett from any <br />and all claims for damages, costs, expenses, or causes of action that <br />may arise because of msalla0on and maintenance of the <br />%d[ydtge 07I Improvement or other rlghtof-way use here to applied for and fanner <br />agrees to remove same upon notice from the City and to replace <br />Approved far Construction, Public Works Dept. Date public pmpeny damaged thereby. <br />� AUFFHORIZEM P THIS PERMIT MUST BEEMEARLEDWITHIN Use akho OF tor PERMST IS l�EDAND�ER�MP ISM BE Ni PUSLADMOOMPLETION and Baker MAY BE CANCELLED Ski <br />OUT UMMMY�P�E OF WORKON THIS PROUREATTONER ��y DURATION EACH INSPECTION EXTENESTHE EXPIRATION LATE IMUAYSM KEEPTHE PERMUT OEM WHILE WORK 15 MFM <br />_APPLICANT/IDa SITE COPY _TREASUREK _ADDRESS FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.