Laserfiche WebLink
t'pak 1: Describe the project during construction <br />Nature and purpose of the construction project: <br />/AO/C olow a,s iktffis t% awe 0-1- uwr <br />cos 9 b es a�1 o� �vaA1 sE,✓eV . <br />Adjacent areas, Including streams, lakes, wetlands, resldemialarea, out rosestbut <br />might be affected by the construction project: <br />/VON <br />Haw upstream drainage areas may affect the site: <br />/1!a { a >L ea/ <br />Downstream drainage leading from the site to a receiving body of water. <br />AW 41L ei <br />Critical areas that receive runoff from the site up to one -quarter mile away: <br />Special requirements and provisions for working, n/e'ar or within critical areas: <br />Areas on the site that have potential erosion problems: <br />�r OhE <br />Locations where surface water leaves the site: <br />1 Cf, Sewctr coJ� bas ti <br />Lily or Erenn Pud¢ Works / <br />Cm Y"W", Slmmwelw Ackow Pn' Mgn Plan <br />l6vrePPl AnyNa or snag FrMwo 2 of 6 <br />