Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 2/2/2022 <br />City of Everett Permit Services Public:arks Permit B: PW2202-0Ut <br />3200 Cedar Street, 2-' Floor Associated Bltlg Permit X: <br />EVERETT <br />Everett, WA 98201 Planning Reference N: <br />WASHINGTON 425-257-8810 Public Works Fee: $406.36 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />EVERETT SCHOOL DIST 2 <br />MATT RASM USSEN <br />4730 COLBY AVE <br />EVERETT, WA, 98203 <br />PHONE: <br />PHONE: 2067190991 <br />TAX PARCEL ID X: 00593663700000 <br />SIIE ADDRESS: 2911 CALL FORNIA AVE <br />DESCRIPTION: APPROX 12008F OF SIDEWALK REPLACED IN ROW FOR ESD <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMDCONOmONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall he performed in accordance with the permit and current City of Everett'Uesign and Construction Standards and Specifications <br />for Developmerm. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count TOLL FREE NUMBER 811. <br />4. Site CINI Work to be done per plans approved by the City of Everett Public Works Department. Approved plans must remain on jobsiteat <br />alltimes. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br />required Inspection. A handout Is provided at permitissuancewith instructions on how to request an inspection online. <br />6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector or the approved <br />SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br />T. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground counties during construction. <br />9. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />10. It is the applicant/owner's responsibilityto ensure that stormwater runoff from new/replaced impervious surfaces will be managed on - <br />skein a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the <br />Improvements located therein. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained <br />from the City's Traffic Engineering Division. This permit can be applied for online at pw.evemdwa.gov and requires a traffic control plan to be <br />submitted for the area of requested closure. Please allow 1-2 weeks for TSV permit issuance from the date of application. <br />12. This permit must be finaled in Omer to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br />selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br />completed. <br />Public Works Permit Fee Breakdown: <br />Paving(1.2005F1..............................................$45.00 <br />PW Plan Review ...................520.00 <br />PW Site Inspection...........................................$20.00 <br />StormwMer System Development Fee .......... $321.36 <br />City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br />By purchRepair Is Permit and commencing work the owner/applicant <br />hereby agrees to hold and save harmless the Cnyof Everett Rom any <br />and all claims for damages, costs, expenses, or causes of action that <br />A may install-&-varntl <br />or ose ther eherenanreofdhe <br />Improvement fa <br />�� // 02192022 Impruvemennorotam nwayurom <br />tetaty and to replace <br />upon <br />agreeste remove same upon notice From the City and to replace <br />Approved for Construction, Public Works Dept. Date public proPeNy damaged thereby. <br />Approved <br />WORK AUTHORKED A THE PEREARTIALEFFINESTARTED WITHINUM Dow OF DURE PERMIT IS MUM And THEREAFTER IS TOM DIRGENTELY PURSUED TO COMPLEPOR. THIS PERMIT MAY Sy CANGUED I THE <br />Cm UPON MY �PP�E OF WERE ON THE PROJEFTOWER OURDAY DURATENOW I INA�M EXTENDS THE EXPIRATION MUM "us TO WITTER PERIMPE OPEN WHILE WORK IS AFFENE. <br />_APPLIrANT/IOa SITE COPY _TREASURER _ADDRESSFILE <br />