My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1929 VIRGINIA AVE 2023-10-23
>
Address Records
>
VIRGINIA AVE
>
1929
>
1929 VIRGINIA AVE 2023-10-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 9:15:59 AM
Creation date
9/11/2023 9:30:50 AM
Metadata
Fields
Template:
Address Document
Street Name
VIRGINIA AVE
Street Number
1929
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: P2203-012 <br />Applied: 3/7/2022 <br />Issued: 3/8/2022 <br />Status: FINALED <br />Parent Permit: BW2011-001 <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:3/7/2022 <br />Finaled: 8/10/2022 <br />Description: Partial remodel <br />Site Address: 1929 VIRGINIA AVE <br />City, State Zip Code: EVERETT, WA 98201 <br />Applicant: Eric Dixon <br />Owner: JAMES & TERESA MAX <br />Contractor: PRECISION PLUMBING & HEATING <br />Details: <br />Add bathroom to basement, retrim existing bathroom, kitchen sink, laundry sink <br />"SUBJECT TO FIELD INSPECTION" "ADDITIONAL PERMITS MAY BE REQUIRED" <br />Partial remodel <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT REMARKS <br />5/10/2022 <br />5/10/2022 <br />PLUMB 03-ROUGH <br />JASON <br />PARTIAL See Notes <br />IN <br />MORRISSEY <br />APPROVAL <br />Notes: <br />Phone:2062713976 <br />e-Mail: jeff@ricconconstruction.com <br />(5/10/2022 9:55 AM JJM) <br />- Kitchen DWV and water ok. Basement plumbing is not ready. <br />PLUMB 02- <br />5/23/2022 <br />5/23/2022 <br />GROUND <br />JASON <br />CORRECTION <br />WORK/SLAB <br />MORRISSEY <br />REQUIRED <br />Notes: <br />425-299-9609 JtMax1996@gmail.com <br />(5/23/2022 12:15 PM JJM) <br />- Remove extra wye for toilet vent unless rolled above centerline of drain per dry venting requirements. Ok to horizontally wet vent toilet on lay. AdcB" <br />end of line clean -out off branch for bathroom, preferably wet vented portion of3" pipe. <br />PLUMB 02- <br />5/25/2022 <br />5/25/2022 <br />GROUND <br />JASON <br />APPROVAL <br />WORK/SLAB <br />MORRISSEY <br />Notes: <br />5/31/2022 <br />5/31/2022 <br />PLUMB 03-ROUGH <br />JASON <br />APPROVAL <br />IN <br />MORRISSEY <br />Notes: <br />James 425-299-9609 <br />I <br />Printed: Monday, 11 September, 2023 1 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.