Laserfiche WebLink
REMOTE CONTROL <br />VALVE WITH DISC <br />FILTER AND PRV <br />PVC OR POLY SUPPLY HEADER <br />START <br />CONNECTION <br />MALE ADAPIER <br />CV TUBING <br />AREA PERIMETER <br />PVC OR POLY EXHAUST HEADER <br />PERIMETER LATERALS <br />2" TO 4" FROM EDGE <br />MANUAL LINE FLUSHING VALVE <br />PLUMBED TO PVC OR POLY <br />0 //��\ �CV �EN�D FEED LAYOUT <br />------ - DEW - RD SME <br />lAL LINE FLUSHING VALVE <br />IBUD TO PVC OR POLY <br />PERIMETER <br />USING <br />IECTION <br />UST HEADER <br />'LY HEADER <br />TE CONTROL <br />WITH DISC <br />v 2 AND PRV <br />n IRREGULAR AREAS: TRIANGULAR LAYOUT <br />-- DIJN - w ScuE <br />PVC SUPPLY HEADER <br />TOP OF SLOPE <br />MANUAL LINE FLUSHING VALVE <br />[—Techline@ CV LATERAL TUBING <br />PVC EXHAUST HEADER <br />TOE OF SLOPE � <br />4 1/2' <br />MAXIMUM <br />ELEVATION <br />CHANGE <br />L <br />CONVENTIONAL <br />SPACING ON TOP 2/3 <br />OF SLOPE -R <br />EMOTE <br />ER <br />CONVENTIONAL SPACING AND PRV <br />PLUS25% ON BOTTOM 1/3 OF SLOPE <br />NOTE: <br />ALIGN Techline CV LATERALS PARALLEL TO THE CONTOURS OF THE SLOPE <br />2 CV SLOPE FEED LAYOUT <br />DEr6R - ra SEMI <br />FINISH GRADE <br />/ -- 4" DEPTH <br />1 <br />t8" o.c. SPACING <br />SUB GRADE <br />u <br />MANUAL LINE FLUSHING VALVE <br />PLUMBED TO PVC OR POLY <br />rig <br />Techline START <br />CONNECTION <br />MALE ADAPTER <br />PVC OR POLY EXHAUST HEADER <br />i PVC OR POLY SUPPLY HEADER <br />Techline START <br />CONNECTION <br />SEE DETAIL 4 OF 4 <br />�oREMOTE CONTROL <br />VALVE WITH DISC <br />FILTER AND PRV <br />I <br />I <br />I <br />AREA PERIMETER <br />I <br />I <br />I <br />I <br />Techline® CV TUBING <br />I <br />II <br />it <br />PERIMETER LATERALS <br />2" TO 4" FROM EDGE <br />3 CV CENTER FEED LAYOUT <br />pru6 - Ro LLLE <br />FINISH GRADE <br />COMPACTED <br />SUBGRADE <br />Techline TUBING — <br />PVC HEADER <br />Techline TEE (TYP.) <br />Techline START <br />CONNECTION (TYP.) <br />SEE "Techline P I<RA�NG <br />ISLAND TYPICAL <br />LAYOUT", DRAWING <br />FOR PLAN VIEW OF <br />THIS APPLICATION <br />NOTES: <br />1. SEE PLANS h LEGEND <br />FOR ALL DIMENSIONS <br />AND Techline LATERAL <br />SPACING <br />2. RATIO OF Techline LAT- <br />ERALS TO START CON- <br />NECTIONS IS SHOWN AT <br />2:1, BUT MAY VARY PER <br />HYDRAULIC DEMAND ON <br />START CONNECTION. <br />(SEE PLANS & LEGEND) <br />5 SUBGRADE INSTALLATION SUB HEADER INSTALLATION <br />ona - RD wrE s oEUE - w scuE <br />Desig. Two Four/Two Six <br />IIe75 N, WA COURT Se <br />-II'-IITfV' III RNIIAI, W� f665FM19 <br />ph. (425) "1i 26 <br />3h.1719 <br />www.6«pnN76— <br />ur� rr..rr.r.w-s.a-r+ww <br />COMMUNITY <br />HEALTH CENTER <br />OF SNOHOMISH <br />COUNTY- i <br />EVERETT <br />CENTRAL <br />4205 RUCKER AVENUE' <br />EVERM, WA 08203 <br />VUD OUSTmonrCH <br />ON SW ORCHARD STREET <br />SEATTLE, WA IIH34 <br />,N <br />A —� <br />87/13/2017 <br />71fE►'F.*� <br />731 <br />bmloir <br />3/1�Lt� L�L1 ima- Few <br />R.7 %« <br />#At/lR'L9� <br />AS DESIGNED DWAW/NG3 <br />IRRIGATION <br />DETAILS <br />LA <br />