My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2224 WETMORE AVE 2023-09-27
>
Address Records
>
WETMORE AVE
>
2224
>
2224 WETMORE AVE 2023-09-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2023 9:19:04 AM
Creation date
9/11/2023 10:28:07 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2224
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LI <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: PLW2002-006 Description: PLUMBING FOR EXTG KITCHEN,2 BATHRMS&BASEMENT <br /> +ADD 1 BATHRM <br /> Applied:2/28/2020 Approved:1/20/2022 Site Address:2224 WETMORE AVE <br /> Issued:2/10/2022 Finaled:2/15/2023 City,State Zip Code:EVERETT,WA 98201-2836 <br /> Status:FINALED Applicant:JONES JASON C <br /> Parent Permit:BW2002-008 Owner:JONES JASON C <br /> Parent Project: Contractor:OWNER <br /> Details: <br /> **SUBJECT TO FIELD INSPECTION**Expose all unapproved work(including electrical,mechanical,plumbing,and framing systems etc.) <br /> installed/altered without permits and inspection approval**SEPARATE PLUMBING,MECHANICAL, ELECTRICAL PERMITS REQUIRED** <br /> PLUMBING FOR EXTG KITCHEN,2 BATHRMS&BASEMENT+ADD 1 BATHRM <br /> LIS ° SPEe-- <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 5/6/2022 5/6/2022 PLUMB 03-ROUGH JASON PARTIAL <br /> IN MORRISSEY APPROVAL <br /> Notes: <br /> -Rough in DWV and water pipe ok main floor and top floor. <br /> 5/6/2022 5/6/2022 PLUMB 03-ROUGH JASON CORRECTION basement corrections needed <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> Site contact:Jason Jones 425-478-6535 JASONCJONES86@GMAIL.COM <br /> "Please come to the back door for entry."Told Jason to call in the morning to tell that to his inspector <br /> (5/6/2022 11:01 AM JJM) <br /> -Basement Plumbing: <br /> 1)Trap arm for tub over42".Per UPC table 1002.2. <br /> 2)Upsize tub drain to 2"per tables UPC 702.1703.2 fixture unit values and corresponding pipe sizes. <br /> 3)2"drain for main floor lay needs to continue 2"up to 3"building drain/stack. <br /> 4)Disconnect water removal pump discharge pipe from DWV system per code. <br /> 5/19/2022 5/19/2022 PLUMB 03-ROUGH JASON CORRECTION Basement Area <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> JASON 425-478-6535 <br /> (5/19/2022 11:12 AM JJM) <br /> Basement <br /> 2)Upsize tub drain to 2%34 per tables UPC 702.1703.2 fixture unit values and corresponding pipe sizes. <br /> ****Tub drain has to be 2"all the way to vent trap arm fitting.Should be 2"by 11/2"by 11/2"wye with 45 or equivalent fitting. <br /> Printed:Monday, 11 September,2023 1 of 2 SUPERION <br /> _______-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.