Laserfiche WebLink
Hi Alex, <br />Steve told me that there is a list of plants I can plan there -can you send me that list so <br />i can have the planting plan ready? <br />Also, can you issue a basement permit now? I can have the inspector check it out <br />while i work on other items to get this house cleared up. <br />On Tue, May 18, 2021 at 9:48 PM Kevin D <kedo10096Dgmail.com> wrote: <br />Alex, can you send me the list of th plant I can plant in that 100 soft area and then I <br />will be able to write the plan as I have no idea what kind of plants I need to have in <br />wetland buffers. <br />On Tue, May 11, 2021 at 4:05 PM Alex Byrd <ABvrd(cDeverettwa.gov> wrote: <br />Hi Kevin, <br />I have outlined the next steps in several previous emails and during our meeting on <br />2/24. 1 have included my most recent email that includes instructions (sent on <br />3/31): <br />We can go ahead and issue the permit forthe interior work only (the shed and deck <br />work would need to be completely removed from the current permit and plans). <br />If you are asking about demolishing the shed and enhancing the critical area buffer <br />with this permit, the plans will need to be revised accordingly. Per our meeting on <br />February 24th, please submit a planting plan so we can review. A Critical Area <br />Covenant is also required (see attached). <br />Once we approve the revised plans and planting plan, we can go ahead and issue <br />the permit. However, the planting must be completed priorto final inspection. <br />Thanks, <br />Alexandria Byrd <br />Assistant Planner I Community, Planning & Economic Development <br />425.257.7281 1 3200 Cedar Street 2nd FI., Everett, WA 98201 <br />everettwa.gov I Facebook I Twitter <br />