My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10929 10TH DR SE 2023-09-19
>
Address Records
>
10TH DR SE
>
10929
>
10929 10TH DR SE 2023-09-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2023 9:00:34 AM
Creation date
9/11/2023 1:14:23 PM
Metadata
Fields
Template:
Address Document
Street Name
10TH DR SE
Street Number
10929
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: E2210-070 <br />Applied: 10/10/2022 <br />Issued: 10/21/2022 <br />Status: FINALED <br />Parent Permit: B2107-055 <br />Parent Project: <br />Details <br />Permit Inspections <br />City of Everett <br />Approved:10/12/2022 <br />Finaled: 6/8/2023 <br />Description: 10 circuit for 1st floor remodel FOR AFH <br />Site Address: 10929 10TH DR SE <br />City, State Zip Code: EVERETT, WA 98208 <br />Applicant: ENERGY MANAGEMENT SERVICES INC <br />Owner: MEBRATE ASTER & SEYOUM HAILEYESUS <br />Contractor: ENERGY MANAGEMENT SERVICES INC <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />10/25/2022 <br />10/25/2022 <br />ELEC 06-ROUGH IN <br />STEVE BANKS <br />NO ACCESS <br />eTRAKiT Inspection Request <br />Notes: <br />10/22/2022 11:35 AM ENERGY MANAGEMENT SERVICES INC <br />Contact Name: ENERGY MANAGEMENT SERVICES INC <br />Site Address: 10929 10TH DR SE <br />Phone:4252737300 <br />e-Mail: ems@emsiwa.com <br />2:44 Reschedule online when access is available call the inspector between 730 and 830 on the morning of the inspection to find out ETA and give any <br />access instructions if necessary. <br />2:44 Reschedule online when access is available call the inspector between 730 and 830 on the morning of the inspection to find out ETA and give any <br />access instructions if necessary. <br />10/26/2022 <br />10/26/2022 <br />ELEC 06-ROUGH IN <br />STEVE BANKS <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />Notes: <br />10/25/2022 6:37 PM ENERGY MANAGEMENT SERVICES INC <br />call Sam Nam 425-273-7300 please <br />Contact Name: ENERGY MANAGEMENT SERVICES INC <br />Site Address: 10929 10TH DR SE <br />Phone:4252737300 <br />e-Mail: ems@emsiwa.com <br />Obtain a mechanical permit, complete the mechanical Installation and get approval prior to electrical Rough in inspection. You cannot bundle all of the <br />NM cables and only three cables per drilled hole and you cannot bundle strap them along the floor joist. Make up all grounds. Run a grounding <br />electrode conductor to where the water enters the building within 5 feet and bond around the pressure relief valve. Add a receptacle above the <br />dishwasher. Finish wiring disposal. the microwave must be on a dedicated circuit. Remove the low voltage cables from the line voltage cable holes. Not <br />ready. <br />Obtain a mechanical permit, complete the mechanical Installation and get approval prior to electrical Rough in inspection. You cannot bundle all of the <br />NM cables and only three cables per drilled hole and you cannot bundle strap them along the floor joist. Make up all grounds. Run a grounding <br />electrode conductor to where the water enters the building within 5 feet and bond around the pressure relief valve. Add a receptacle above the <br />dishwasher. Finish wiring disposal. the microwave must be on a dedicated circuit. Remove the low voltage cables from the line voltage cable holes. Not <br />ready. <br />Obtain a mechanical permit, complete the mechanical Installation and get approval prior to electrical Rough in inspection. You cannot bundle all of the <br />NM cables and only three cables per drilled hole and you cannot bundle strap them along the floor joist. Make up all grounds. Run a grounding <br />electrode conductor to where the water enters the building within 5 feet and bond around the pressure relief valve. Add a receptacle above the <br />I <br />Printed: Thursday, 08 June, 2023 1 of 3 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.