Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />10/14/2022 <br />10/14/2022 <br />PLUMB 03-ROUGH <br />JASON <br />APPROVAL <br />eTRAKiT Inspection Request <br />IN <br />MORRISSEY <br />Notes: <br />10/13/2022 6:26 AM Pacharung Kounpungchart <br />Contact Name: Pacharung Kounpungchart <br />Site Address: 10929 10TH DR SE <br />Phone:2062279534 <br />e-Mail: pjtheplumberl@gmail.com <br />PLUMB 02- <br />10/14/2022 <br />10/14/2022 <br />GROUND <br />JASON <br />APPROVAL <br />WORK/SLAB <br />MORRISSEY <br />Notes: <br />PERMIT EXTENSION <br />6/7/2023 <br />6/7/2023 <br />(REASON <br />SHARON <br />EXTENSION <br />REQUIRED) <br />GILFEATHER <br />APPROVED <br />Notes: <br />not finished yet <br />6/9/2023 <br />6/9/2023 <br />PLUMB 08-FINAL <br />JASON <br />CORRECTION <br />see notes <br />MORRISSEY <br />REQUIRED <br />Notes: <br />206-495-4032 <br />ASAPRESTOREI@GMAIL.COM <br />- Install hammer arrester on supply line to DW per the UPC 609.10 Water HammerBuilding water supply systems where quick -acting valves are installed <br />shall be provided with water hammer arrester(s) to absorb high pressures resulting from the quick closing of these valves. Water hammer arresters shall <br />be approved mechanical devices that comply with ASSE 1010 or PDI-WH 201 and shall be installed as close as possible to quick -acting valves.- Caulk <br />downstairs shower escutcheon and toilet as well as pedestal base in all bathrooms, per the UPC 402.2 Joints <br />6/13/2023 <br />6/13/2023 <br />PLUMB 08 FINAL <br />JASON <br />APPRVD-PERMIT <br />eTRAKiT Inspection Request <br />MORRISSEY <br />FINAL <br />Notes: <br />6/12/2023 2:54 PM Bernard Fajarillo <br />Contact Name: Bernard Fajarillo <br />Site Address: 10929 10TH DR SE <br />Phone:2067954032 <br />e-Mail: asaprestorel@gmail.com <br />I <br />Printed: Wednesday, 14 June, 2023 2 of 2 rk <br />SUPERION <br />