Laserfiche WebLink
PUBLIC WORKS PERMIT <br />Date Applied: <br />5/16/2023 <br />City of Everett Permit Services <br />Public Works Permit If: <br />PW2305-010 <br />3200 Cedar Street, 2.d Floor <br />Associated Bldg Permit#: <br />EVERETTEverett, <br />WA 98201 <br />Planning Reference#: <br />everettwa.Rov/permits <br />Public Works Fee: <br />$985.83 <br />WASHINGTON <br />Perm it5e ryices0eyerettwa. gay <br />Schedule Inspections at onllneoermits.everettwa.eov <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />COLUMBIA CASCADE PUCEN LLC JOE MYERS <br />PO BOX 790830 <br />SAN ANTONIO, TX 28279-0830 <br />PHONE: PHONE: 5094827D16 <br />SITE ADDRESS: 7601 EVERGREEN WAY TAX PARCEL ID#: 2WSO700306100 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: REMOVE, REPLACE CONCRETE/ASPHALT FOR SAFEWAY FUEL REPIPING <br />NOTES: <br />PERMITCONDITIONS: <br />1. All inspections shall be scheduled online at hope//onllneoermioeverettwa.tow. Available inspection antes are shown in the droodown menu. <br />2. All work shall be performed in accordance with the permit and current Cry of Everett 'Design and Construction Standards and SpedBcatlonz for <br />Development. <br />3. Can Location Underground Service 48 hours before You dig The day You call does not count. TOLL FREE NUMBER 811, <br />4. Site Clml Work to he done per plans approved by the Cltyof Everett Public Works Department. Approved plans must remain onjolsato at all times. <br />S. listeners are required for all stages of consf ection. Visit the CHWs Online Permitting Portal at onlinepermits.everettiva.gov to formally request all <br />required inspections. <br />6. Install and maintain erasion control measures per Clty of Everett Standards and per the direction of the PW Inspector and the approved <br />SWPPP/TESC Plan. Remove upon completion of the project prince final approval of the Pirmlt. <br />T. Keep Citystreets clean at all times. No din, mud, rocks, or debris to he tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. Any damageto Oty Improvements (sidewalk, curb, roadway, ee.) shall be replaced per City Standards and/or as directed bythe City PW Inspector. <br />30. It latheapplicant/owners responsibllityto ensure that Remainder mnoNfrom new/replaced impervious surfaces will be managed on -site in <br />manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the improvements located <br />therein. <br />11. Priore any interruption to the public right-of-way(roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall Be obtained from the <br />City's Traffic Engineering Division. This permit can he applied for online at onlinepermbreverettwa.gov, and requires a trafficcontrol plan to be <br />submitted for the area of requested closure. Please allow 1-2 weeks formal permit Issuance from the date of application. <br />12. Request a final Inspection online by selecting PW 25 Site Final/Permit Close Outwtthin the Online Permitting Portal Inspection Requests for this <br />permit when all items have been completed. <br />PERMIT FEE BREAKDOWN <br />Erosion Control..............................................................$201 <br />Paving (2617 SF)...............................................................$65.00 <br />PW Plan Review...............................................................$2DW <br />PW Site Inspection...........................................................$20.0o <br />Stormwater System Development Fee (2617 SF) .......... <br />$700.83 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and <br />all claims for damages, costs, expenses, or causes of action that may arise because of Installation and maintenance of the Improvement or other <br />right-of-way man here to applied for and further agrees to remove same upon notice term the City and to replace public property damaged <br />thereby. <br />VALIDITY/EXPIRATION: <br />Work authorized by this permit must he started within 190 der of date permit is issued and thereafter is to be diligently pursued to completion. <br />This permit may be canceled by the city upon any stoppage of work on this project over Legal duration. Each Inspection extends the expiration <br />date 19D days to keep the permit open while work is active. <br />Page 1 of 1 <br />_APPLICANT/IOB SRE COPY _ADDRESS FILE _TREASURER <br />