My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7601 EVERGREEN WAY SAFEWAY FUEL STATION 2023-09-11
>
Address Records
>
EVERGREEN WAY
>
7601
>
SAFEWAY FUEL STATION
>
7601 EVERGREEN WAY SAFEWAY FUEL STATION 2023-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2023 2:48:30 PM
Creation date
9/11/2023 2:36:52 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7601
Tenant Name
SAFEWAY FUEL STATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® FOR REGULAR ONLY <br />UST INSTALLATION NOTES: <br />1. <br />SLOPE CONCRETE AWAY FROM ALL MANHOLES 2" RISE OVER 24" RUN. <br />105 FOR REGULAR <br />AGGREGATE BASE <br />CONCRETE SLAB <br />2. <br />USE PEA GRAVEL CONSISTING OF NATURALLY ROUNDED AGGREGATE, <br />OR <br />MINIMUM 1/8" AND MAX OF 3/4" IN SIZE, FREE OF CLAY, SLAG, CINDERS, <br />127 OR 128 OR 129 <br />106 FOR PREMIUM <br />108 FOR REGULAR AND PREMIUM <br />OR DEBRIS. ALL SUBSTITUTES MUST BE APPROVED BY <br />MANUFACTURER'S AND OWNER'S FIELD REPRESENTATIVE. <br />5 OR <br />5 OR <br />107 FOR DIESEL 2" MINIMUM <br />109 FOR DIESEL 2" MINIMUM <br />I <br />3. <br />REAM ALL RISERS FOR FULL PIPE BORE. <br />4 <br />2'/3' DOUBLE WALL <br />4. <br />PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A BEDDING <br />- '4 1 <br />`O <br />.. <br />FRP PRODUCT PIPING <br />OF COMPACTED, APPROVED BACKFILL 8" THICK. PIPING SHALL NOT BE <br />- 4 <br />4 <br />SUPPORTED BY BLOCKS, PLANKS, OR OTHER DEBRIS. <br />a. <br />5. <br />PAINT ALL LIDS PER DETAIL ON THIS SHEET. <br />Z � <br />30 <br />121 122 <br />FOR REGULAR AND PREMIUM ONLY 123 <br />- <br />APPROVED BACKFILL <br />AND <br />3 181 <br />131 FOR REGULAR <br />124 <br />/ <br />OR <br />OR <br />132 FOR PREMIUM <br />FOR DIESEL 181 3 <br />OR <br />120 <br />133 FOR DIESEL <br />162r <br />�306 <br />76-' <br />134 <br />`O 6"10" 10" <br />82 <br />301 322 <br />317 <br />OTE: <br />TRENCNHCORNERS <br />SHOULD BE CUT AT 45° <br />TO ACCOUNT FOR <br />125 <br />BENDS IN PIPING <br />LJ - 4. 6.. <br />TANK FILL <br />�01 STAGE 1 VAPOR RECOVERY <br />PIPING TRENCH <br />ASCALE: <br />1" =1'-0" <br />` 1 SCALE: 1"= V-0" <br />` lJ SCALE: 1" = 1'-0" <br />REGULAR UNLEADED <br />WHITE <br />1 15fi <br />2" MINIMUM <br />�i <br />A NOTES: <br />- - <br />FIELD SEALED JOINT <br />4 <br />(ADHESIVE SUPPLIED WITH SUMP) <br />1. VERIFY PROPER ORIENTATION OF THE SUMP <br />- <br />PRIOR TO BONDING SUMPS TO MOUNTING <br />4 <br />COLLAR. <br />PREMIUM UNLEADED <br />RED <br />i/� <br />513 <br />2. FIRST INSTALL POLYGON SUMP RISER TO <br />TANK MOUNTING COLLAR PERMANUF <br />531 <br />THEE THEN <br />ENTIRE <br />GLASS WRAP IRE <br />GLASS RAP & L AWARE <br />'`LL <br />533 <br />� <br />ELAMINATETHE <br />OUTSIDE OF PERIMETER OF THE BOTTOM <br />CONNECTION FOLLOWING CURING OF <br />E <br />ADHESIVE. SPECIFIC ATTENTION MUST BE <br />ifi0 <br />GIVEN SURFACE PREPARATION. <br />DIESEL <br />L <br />FIBERGLASS MAT MUST BE 6" WIDE MINIMUM <br />YELLOW <br />AND MUST EXTEND 1/2" BEYOND COVERAGE <br />CONDUIT <br />OF ADHESIVE. <br />3. FIRST INSTALL SUMP LID TO POLYGON SUMP <br />COAT FITTING <br />RISER PER MANUFACTURER INSTRUCTIONS. <br />CONNECTION TO <br />THEN GLASS WRAP & LAMINATE THE ENTIRE <br />PREVENT CORROSION <br />2 <br />INSIDE AND OUTSIDE PERIMETER OF THE <br />TANK INTERSTITIAL, <br />TOP CONNECTION FOLLOWING CURING OF <br />GROUND ROD AND <br />ADHESIVE. SPECIFIC ATTENTION MUST BE <br />AUTOMATIC TANK GAUGE <br />GIVEN TO SURFACE PREPARATION. <br />BLACK <br />FIBERGLASS MAT MUST EXTEND 1/2" <br />BEYOND COVERAGE OF ADHESIVE. <br />FIELD SEALED JOINT <br />(ADHESIVE SUPPLIED WITH SUMP) <br />VAPOR RECOVERY <br />ORANGE CIRCLE A MINIMUM <br />OF V BEYOND EDGE OF <br />REMOVABLE LID <br />514 <br />OBSERVATION WELL <br />WHITE CIRCLE WITH BLACK TRIANGLE <br />i <br />z <br />Z <br />'> <br />COLLAR BONDED TO TANK <br />FIELD SEALED JOINT <br />(ADHESIVE SUPPLIED WITH SUMP) <br />1 <br />SUMP CONNECTION <br />DSCALE: <br />TANK LID PAINTING <br />E <br />INTERSTITIAL SPACE MONITOR <br />Fr <br />1" = 1'-0" <br />NOT TO SCALE <br />1 SCALE: 1"=1'-0" <br />REVISIONS <br />rc <br />0 <br />N <br />y <br />r <br />z <br />a <br />a <br />Q M <br />3 <br />Q <br />W <br />FLU <br />LLI K 0 <br />w <br />LL o > <br />QN W W <br />C0 W <br />n <br />V <br />J <br />Q <br />H <br />W <br />cl <br />3 <br />2 <br />�V <br />W <br />Z <br />W <br />W <br />W� <br />z <br />QD_ <br />F-a <br />,w <br />~e <br />V , <br />1 <br />Zz <br />HQ <br />DIAMOND Z ENGINEERING, INC. <br />W70 STATE ROAD <br />CLEVELAND, OH 44134 <br />PHONE: 440d 24 Wl <br />SCALE: <br />DATE: <br />AS NOTED <br />02/24/2023 <br />DRAWN BY: <br />PROJECTNO.: <br />DRF <br />WA-4226 <br />DRAWING NO. <br />T-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.