Laserfiche WebLink
O <br />DONE! <br />You have now completed the Small Project Stormwater Report. <br />Please review any sections you may have skipped to ensure all areas have been completed. <br />Ensure the following attachments have been added. <br />9 Project Specific Stormwater Site Plan Submitted under separate Cover by the City of Everett <br />I@ Topographic Survey Submitted under separate Cover by the City of Everett <br />I@ Declaration of Covenant and Grant of Easement N/A <br />al Construction SWPPP Drawings IContractor to prepare <br />9 Map of Project Site Boundary and the Infiltration Infeasibility Mapping Results Infeasible <br />Worksheet 3— Sizing Justification Worksheet for your Selected BMP I WA <br />9 Underground Injection Well (UIC) Registration* <br />*You may need to register with the Washington State Department of Ecology at least 60 <br />days prior o commencing UIC Construction. For more information, visit. <br />everettwa gov/1986/8tormwater Technical -Resources <br />NO bmvs are proposea mat meet me aennmon or a <br />UIC. thus none are required to be registered <br />City of Everett Public Works <br />Smell Project Stormwater Site Plan Report Dec 2019 <br />