My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11500 SILVER LAKE RD 2025-04-21
>
Address Records
>
SILVER LAKE RD
>
11500
>
11500 SILVER LAKE RD 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 9:01:14 AM
Creation date
9/11/2023 3:22:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE RD
Street Number
11500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Worksheet 2 Infeasibility Criteria <br />MINIMUM REQUIREMENT #5 On -Site Stormwater Management <br />The following tables summarize infeasibility criteria that can be used to justify not using various on -site <br />stormwater management best management practices (BMPs) for consideration for Minimum Requirement <br />IS. This information is also included under the detailed descriptions of each BMP in the 2019 SWMM but is <br />provided here in this worksheet for additional clarity and efficiency. Where any inconsistencies or lack of <br />clarity exists, the requirements in the main text of the Stormwater Manual shall be applied. <br />Evaluate the feasibility of the BMPs in priority order based on List #1 or #3. Select the first BMP that is <br />considered feasible for each surface type. Document the infeasibility (narrative description and rationale) for <br />each BMP that was not selected. Only one infeasibility criterion needs to be selected for a BMP before <br />evaluating the nett BMP on the list. Attach additional pages for supporting information if necessary. <br />Lawn and Landscaped Areas <br />BMP and <br />Infeasibility description <br />applicable ltsh <br />Infeasibility criteria and rationale for each <br />BMP not selected <br />T5.13 <br />❑ Siting and design criteria provided in BMP T5.13 <br />Posiconstruction <br />(Mormwater Manual Volume V, Section SS) cannot be achieved. <br />Soil Quality and <br />p Lawn and landscape area is on till slopes greater than 33 percent. <br />D th <br />di <br />BMP and <br />Infeasibility description <br />applicable lMts <br />Infeasibility criteria <br />and rationale for each <br />BMP not selected <br />T5,30 <br />❑ Site setbacks and design criteria provided In BMP 1`330 <br />NO ROOFS <br />Full Dispersion <br />(Starmwater Manual Volume V, Section 5.3) cannot be achieved. <br />❑ A 65 to 10 ratio of forested or native vegetation area to <br />Impervious area cannot he achieved. <br />❑ A minimum forested or native vegetation flowpath length of 100 <br />feel(25 feet for sheet flow from a non native Pervnone") <br />cannot be achieved. <br />T5.10A <br />❑ Evaluation of infiltration is not required per the Infiltration <br />Downspout <br />Infeasibility Map due to steep slopes, erosion hazards, or <br />Full Infiltration <br />landslide hazards. <br />❑ Site setbacks and design criteria provided in BMP TS.l OA <br />(Stormuater Manual Volume ill, Section 3.1.1) cannot be <br />achieved. <br />❑ The lots) or site does not have out -wash or loam soils. <br />❑ There is not at least 3 feet or more of Permeable soil from the <br />proposed final grade to the seasonal high groundwater table, <br />hardpan layer, or other impermeable layer. <br />❑ There is not at least 1 foot or more of Permeable soil from the <br />proposed bottom of the infiltration system to the seasonal high <br />groundwater table, hardpan layer, or other impermeable layer. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report Dec 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.