My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11500 SILVER LAKE RD 2025-04-21
>
Address Records
>
SILVER LAKE RD
>
11500
>
11500 SILVER LAKE RD 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 9:01:14 AM
Creation date
9/11/2023 3:22:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE RD
Street Number
11500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP and <br />Infeasibility description <br />applicable lisp <br />Infeasibility criteria <br />and rationale for each <br />BMP not selected <br />T5.10B <br />❑ Site setbacks and design criteria provided in BMP T5.10B <br />NO ROOFS <br />Downspout <br />(SWMMWW, Section V 4. 1) cannot be achieved. <br />Dispersion <br />❑ For splash blocks,a vegetated flowpath at least 50 feet in length <br />Systems <br />from the downspout to the downstream progeny line, structure, <br />stream, wetland, slope over 15 percent, or other impervious <br />surface is not feasible. <br />❑ For trenches,a vegetated flowpath of at least 25 feet in between <br />the model of the trench and any property line, structure, stream, <br />wetland, or impervious surface is no feasible. A vegetated <br />flowpath of at least 50 feet between the outlet of the trench and <br />any slope steeper than 15 percent is not feasible. <br />Ill <br />❑ Evaluation of infiltration is not required per the Infiltration <br />Perforated <br />Infeasibility Map due to all slopes, erosion hazards, or landslide <br />Stub out <br />hazards <br />Connections <br />❑ For sites with septic systems, the only location available for the <br />perforated portion of the pipe Is located up gradient of the <br />drainfield primary and reserve areas. This requirement can be <br />waived if site topography will clearly prohibit flows from <br />Intersecting the dainfleld or where site conditions (soil <br />permeability, distance between systems, etc.) indicate that this is <br />unnecessary. <br />❑ Site setbacks and design criteria provided in BMP T5.10C <br />(SWMMWW, Section V-4.1 or DCSS Section 4 4.1(3) cannot be <br />achieved. <br />❑ There is not at least 1 foot of permeable soil from the proposed <br />bottom (final grade) of the perforated stub out connection trench <br />to the highest estimated groundwater table, hardpan, or other <br />impermeable layer. <br />❑ The only location available for the perforated stub out connection <br />is under impervious or heavily compacted soils. <br />City of Everett Public Works <br />Small Project Smrmwater Site Plan Report Dec 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.