My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11500 SILVER LAKE RD 2025-04-21
>
Address Records
>
SILVER LAKE RD
>
11500
>
11500 SILVER LAKE RD 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 9:01:14 AM
Creation date
9/11/2023 3:22:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE RD
Street Number
11500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP and <br />Infeasibility description <br />applicable lists <br />Infeasibility criteria <br />and rationale for each <br />BMP not selected <br />T5.15 <br />The following orhmia can be cited as reasons for infeasibility without <br />No existing hard <br />Permeable <br />funherjustlfication(thoughsume require professional services to <br />surfaces are <br />Pavement <br />make the observation): <br />(continued) <br />❑ At sites defined as`high usesHes'(refertothe Glossary in the <br />proposed to be <br />SWMMWW volume I), <br />impacted and <br />infiltration BMPs <br />❑ In areas with 'industrial activity" as identified in 40 CFR <br />are not <br />122.26(b)(14), <br />recommended, <br />❑ Where the risk of concentrated pollutant spills is more likely such <br />as gas stations, truck stops, and industrial chemical storage sites. <br />see previous <br />comments. <br />❑ Where routine, heavy applications of sand occur in frequent snow <br />zones to maintain traction during weeks of snow and ice <br />accumulation. <br />❑ Where the seasonal high groundwater or an underlying <br />impermeable/ low permeable layer would create saturated <br />conditions within 1 foot of the bottom of the lowest gravel base <br />course. <br />T5.14A <br />Note: Criteria with setback distances are as measured from the bottom <br />Infiltration BMPs <br />Bioretention <br />edge of the biorelention soil mix. <br />or Rain Gardens <br />are not <br />recommended, <br />Citation of any of the following infeasibility criteria must be based on <br />see previous <br />an evaluation of site specific conditions and a written <br />recommendation from an appropriate licensed professional (e.g., <br />comments. <br />engineer, geologist, hydroge)logisd: <br />❑ Where professional gertechnical evaluation recommends <br />infiltration not be used due to reasonable concerns about erosion, <br />slope failure, or down gradient flooding. <br />❑ Within an area whose ground water drains into an erosion hazard, <br />or landslide hazard area. <br />❑ Where the only area available forsiting would threaten the safety <br />or reliability of preexisting underground airlines, pre-existing <br />underground storage tanks, preexisting structures, or preexisting <br />road or parking lot surfaces. <br />❑ Where the only area available for siting does not allow for a safe <br />overflow pathway to nationalist drainage system or private storm <br />sewer system. <br />❑ Where there is a lack of usable space for bimetention areas at <br />redevelopment sites, or where there Is insufficient space within the <br />existing public righiuf-way on public road projects. <br />❑ Where infiltrating water would threaten existing below grade <br />basements. <br />❑ Where infiltrating water would threaten shoreline structures such <br />as bulkheads. <br />City of Everett Public Works <br />Small Project Starmwater Sm Plan Report Dec 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.