My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11500 SILVER LAKE RD 2025-04-21
>
Address Records
>
SILVER LAKE RD
>
11500
>
11500 SILVER LAKE RD 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 9:01:14 AM
Creation date
9/11/2023 3:22:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE RD
Street Number
11500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOF DOWNSPOUT BMPS <br />Roof downspout BMPs include infiltration trenches, dry wells, and partial dispersion systems <br />BMP T5.10A Roof Downspout Full Infiltration <br />Downspout full infiltration systems are trench or drywell designs intended for use in infiltrating runoff from <br />roof downspout drains. <br />InfllbaRon Trermh <br />The minimum trench length is based upon the soil type in the location of the infiltration trench. <br />The soils report will provide the USDA Soil Type. The table below provides the minimum trench <br />length per 1,000 ft' of contributing roof area. Roof downspout infiltration trenches shall be <br />designed in accordance with the SWMMWW. <br />• <br />"Coarse sand" <br />(more than 50%of sand fraction remains on k4 sieve) <br />20 <br />"Medium sand" (more than 50%of sand fraction remains on*40 sieve) <br />30 <br />Loamy sand <br />75 <br />Sandyloam <br />125 <br />Loam <br />190 <br />Silt loam <br />275 <br />Fill (only per SWMMWW requirements) <br />60 <br />Trench length required (ft) = Roof area (112) *((minimum trench length) (11)) <br />City of Everett Public Works <br />Small Pmjact Stormwater Site Plan Report nec 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.