Laserfiche WebLink
INFILTRATION BMPS <br />T5.15 Permeable Pavements <br />Project submission requirements include submitting results of infiltration (Ksat) testing, groundwater <br />elevation testing (or other documentation and justification for the rates and hydraulic restriction layer <br />clearance) with the justification for the feasibility decision regarding permeable pavement, and as <br />justification for assumptions made in the runoff modeling. <br />BMP T5.14A - Rain Garden <br />The top of the ported surface area below the overflow shall be at least 5% of the total hard surface area <br />draining to the rain garden. If lawn/landscaped areas will also he draining to the rain garden, it is <br />recommended that the top of the pond call surface area below the overflow be increased by 2%of the <br />lawn/landscaped area. The table below provides rain garden geometry based upon contributing area. Refer <br />to the Rain Garden Handbook for Western Washington: A Guide for Design, Installation, and Maintenance <br />(Hinman at. al. 2013) for construction guidance. Rain gardens shall he designed in accordance with the <br />SWMMWW. <br />2:1 <br />800 or less <br />40 <br />11 <br />ft <br />50 <br />2:1 <br />1400 or leas <br />TO <br />0.13 <br />110 <br />3:1 <br />3000 or less <br />150 <br />1 0.06 <br />1 <br />235 <br />City of Everett Public Works <br />Small Project Stormwater Sale Plan Report Dec 2019 <br />