Laserfiche WebLink
ial, no engr I s.13 neetletl ror proposed project <br />actor shall implement where necessary based on <br />Proposed means and methods. <br />SOURCES: Portion of total amendment quantity (from line 11) tha is: <br />12. Purchased from off -site sources.................................................................... <br />N/A % <br />13. Stockpiled soil and duff from on-site............................................................... <br />N/A % <br />14. Chipped and stockpiled woody material from on -site .......................................... <br />N/A % <br />15. Imported topsoil........................................................................................ <br />N/A % <br />16.CHECK: The total of lines 12 through 15 should total 100% wA............................ 1006 <br />PLANTING BEDS <br />17. Area of landscaping and planting beds (from line 4 above) .................................... 0 ft' <br />a. Multiply by conversion factor from 3 inches to cubic yards(yd'): x0.0093 <br />18. MULCH QUANTITY NEEDED............................................................................. 0 OF <br />SOURCES: PorOon of total mulch quantity (from line 18) that is: <br />19. Purchased from off -site sources............................................................................ N/A % <br />20. Chipped and stockpiled woody material from on -site .............................................. N/A % <br />21. CHECK: The total of lines 19 and 20 should total 100% WA ................................... 100% <br />Artificial, no BMP T5.13 needed for proposed project. <br />Contractor shall implement where necessary based on <br />their proposed means and methods. <br />City of Everett Public Works <br />Smell Project Stormwater Sire Plan Report Uec 2019 43 <br />