My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11500 SILVER LAKE RD 2025-04-21
>
Address Records
>
SILVER LAKE RD
>
11500
>
11500 SILVER LAKE RD 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 9:01:14 AM
Creation date
9/11/2023 3:22:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE RD
Street Number
11500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ial, no engr I s.13 neetletl ror proposed project <br />actor shall implement where necessary based on <br />Proposed means and methods. <br />SOURCES: Portion of total amendment quantity (from line 11) tha is: <br />12. Purchased from off -site sources.................................................................... <br />N/A % <br />13. Stockpiled soil and duff from on-site............................................................... <br />N/A % <br />14. Chipped and stockpiled woody material from on -site .......................................... <br />N/A % <br />15. Imported topsoil........................................................................................ <br />N/A % <br />16.CHECK: The total of lines 12 through 15 should total 100% wA............................ 1006 <br />PLANTING BEDS <br />17. Area of landscaping and planting beds (from line 4 above) .................................... 0 ft' <br />a. Multiply by conversion factor from 3 inches to cubic yards(yd'): x0.0093 <br />18. MULCH QUANTITY NEEDED............................................................................. 0 OF <br />SOURCES: PorOon of total mulch quantity (from line 18) that is: <br />19. Purchased from off -site sources............................................................................ N/A % <br />20. Chipped and stockpiled woody material from on -site .............................................. N/A % <br />21. CHECK: The total of lines 19 and 20 should total 100% WA ................................... 100% <br />Artificial, no BMP T5.13 needed for proposed project. <br />Contractor shall implement where necessary based on <br />their proposed means and methods. <br />City of Everett Public Works <br />Smell Project Stormwater Sire Plan Report Uec 2019 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.