Laserfiche WebLink
Task 4: List #3 approach to MR #5 compliance (flow control exempt projects <br />You are required to use the first applicable BMP that is considered feasib/traeasco <br />category (lawn, landscape and hard surfaces) below. <br />Mark whether the BMPis feasible or infeasible. if you select infeasible, cfeasibility (See Worksheet 2) and or a reference to supporting documen <br />glgttechnical report). <br />List #3: On-&'tte Stormwater Management BMPs for Flow Control Ex" Projects <br />Feasible <br />Infeasible <br />If inf Bible provide justification <br />BMPT5.13: <br />Pos4Con51 net Soll <br />Duality and Depth <br />Fea•raie <br />Infe,,ih1eA <br />If infeasible provide justification <br />*Soils report required for this BMP <br />*BMP T5.10a: <br />Downspout Full Infiltration <br />or <br />BMP 5.30: <br />Full Dispersion <br />BMPT5.10B: <br />Downspout Dispersion <br />Systems <br />BMPT5.10C: <br />Perforated Stub out <br />Connections <br />r <br />Fii Infe,JIvs <br />save <br />If infeasible provide justification <br />BMPT5.12: Sheet Flow Dispersion <br />or <br />BMPT5.11: Concenaated Flow <br />DlSperSlon <br />®Task 5: Hach sizing implementation for the BMP select hove in List #1 or #3. <br />Wor eet3(aha ed)provides tools for sizing your selected BMP. out the sizing <br />j ification sheet for ur selected BMP in Worksheet 3 and submit to P mit Services <br />ttached to this report. <br />City of Everett Public Works <br />Small Project Stormwater Sde Plan Report Dec 2019 <br />