My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
802 E MUKILTEO BLVD 2023-09-14
>
Address Records
>
E MUKILTEO BLVD
>
802
>
802 E MUKILTEO BLVD 2023-09-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:45:32 AM
Creation date
9/12/2023 6:13:47 AM
Metadata
Fields
Template:
Address Document
Street Name
E MUKILTEO BLVD
Street Number
802
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2208-210 Description: Installation of vehicle charging stations <br /> Applied:8/23/2022 Approved: 10/19/2022 Site Address:802 E MUKILTEO BLVD <br /> Issued: 10/25/2022 Finaled:9/12/2023 City,State Zip Code:EVERETT,WA 98203 <br /> Status: FINALED Applicant:Jeremy Smithson <br /> Parent Permit:PW2209-007 Owner:CITY OF EVERETT <br /> Parent Project: Contractor:PUGET SOUND SOLAR(ELEC)LLC <br /> Details: <br /> Installation of vehicle charging stations <br /> new circuits and charging stations <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 1/12/2023 1/12/2023 ELEC 06-ROUGH IN MICHAEL APPROVAL VEHICLE CHARGING STATION <br /> WICKLANDER <br /> Notes: <br /> 206-962-7060 <br /> BADAMS@PUGETSOUNDSOLAR.COM <br /> Ensure circuits installed in flexible metal conduit are bonded in accordance with 348.60/250.118(5)/6b. <br /> 1/27/2023 1/27/2023 ELEC 02-GROUND MICHAEL APPROVAL as noted <br /> WORK WICKLANDER <br /> Notes: <br /> DITCH COVER <br /> mhw changed Inspection Type from ELEC09-OTHER to ELEC 02-GROUND WORK <br /> Approve trench rough in,provided concrete utilized for backfill. <br /> 8/24/2023 8/24/2023 TELEC 10-FINAL MICHAEL APPRVD-PERMIT eTRAKiT Inspection Request <br /> WICKLANDER FINAL <br /> Notes: <br /> 8/21/2023 2:02 PM Lyudmila Arseniy <br /> Contact Name:Will SUmner <br /> Site Address:802 E Mukilteo BLVD <br /> Phone:2066411542 <br /> e-Mail:will@pugetsoundsolar.com <br /> Approve three wall-connected EV stations. <br /> Three bollard type are not installed(for future)on the west side of the parking are,call in for reinspect once these are installed in a <br /> I <br /> Printed:Tuesday, 12 September, 2023 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.