<br />GENERAL INFORMATION
<br />HVAC CONTRACTOR:
<br />GENERAL MECHANICAL:
<br />VICINITY MAP:
<br />WSEC & COMMISSIONING NOTES:
<br />PROPERTY TAX Ill
<br />EMERALD AIRE INC
<br />STANDARDS,
<br />a
<br />THERMOSTATS SHALL BE INTERLOCKED TO PREVENT SIMULTANEOUS HEATING AND
<br />290518800400500
<br />5108 D STREET
<br />EQUIPMENT AND MATERIALS SHALL CONFORM WITH APPROPRIATE
<br />g
<br />COOLING PER WSEC 403.2.4.1.1
<br />AUBURN, WA 98001
<br />PROVISIONS OF ARL, ASME, ASTM, UL, NEMA, ANSI, SMACNA,
<br />LEGAL DESCRIPTION:
<br />PROJECT MANAGER:
<br />ASHRAE, MFPA, OTHER APPLICABLE AGENCIES AND AHJ AS
<br />ECONOMIZERS SHALL MODULATE OUTSIDE AIR FROM MINIMUM TO 100%
<br />SEC 18 TWP 29 RGE 05 LOT 1 OF PORT GARDNER LANDING
<br />CONTACT, EMERALD AIRE, INC,
<br />APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY
<br />BSP REC VOL 2 OF BSPS PIG 108-109 AF NO 9609275005
<br />VOICEI(253) 872-5IRS
<br />CODES,
<br />-`
<br />5
<br />ECONOMIZER CONTROLS SHALL BE CAPABLE OF EVALUATING OUTDOOR AIR COOLING
<br />BEING A PTN OF SE j 182905
<br />FAX, (253) 872-565
<br />ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH
<br />o
<br />CAPACITY PER WSEC C403.3.1.1
<br />ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES AND
<br />B
<br />GENERAL CONTRACTOR:
<br />ORDINANCES. IN CASE OF CONFLICT BETWEEN THE
<br />p
<br />INSULATE REFRIGERANT PIPING PER WSEC TABLE C403,2.8
<br />KIRTLEY COLE
<br />DRAWINGS/SPECIFICATIONS AND THE CODES AND ORDINANCES,
<br />PROJECT LOCATION:
<br />2820 OAKES AVENUE
<br />THE MOST STRICT STANDARD (IN THE OPINION OF THE
<br />♦
<br />SEAL DUCTWORK PER WSEC C403.2.7.3
<br />1710 W MARINE VIEW DR,
<br />SUITE B
<br />ENGINEER) SHALL APPLY, THE MECHANICAL CONTRACTOR SHAL
<br />'eMain
<br />EVERETT, WA 98201
<br />SATISFY CODE REQUIREMENTS &REQUIREMENTS OF THE
<br />a. a
<br />INSULATE DUCTWORK PER WSEC C403.2.7. 1 AND C403.2.7.2
<br />EVERETT, WA 98021
<br />JAMES SCHWARTZ
<br />CONTRACT DOCUMENTS AS A MINIMUM STANDARD,
<br />5H S1
<br />JSCHWARTZ@KIRTLEY-COLE,COM
<br />APPLICABLE CODES,
<br />COMMISSIONING PER WSEC C408 INCLUDING COMMISSIONING PLAN, SYSTEMS
<br />PROJECT DESCRIPTION:
<br />�: s
<br />BALANCING, FUNCTIONAL TESTING, CONTROLS TESTING, OPERATION AND
<br />DUCT CONNECTION FROM INSTALLED ROOFTOP UNITS
<br />2018 IMC W/WASHINGTON STATE AMENDMENTS,Z
<br />3 a
<br />MAINTENANCE MANUALS, AND RECORD DRAWINGS, SHALL BE SUBMITTED TO OWNER
<br />(UNDER PERMIT # M2301-094), VENTILATION USING
<br />2018 IBC W/WASHINGTON STATE AMENDMENTS
<br />Puget Sound
<br />ON PROJECT COMPLETION. PER 2018 WSEC C408.1 EXCEPTION 1, MECHANICAL
<br />EXHAUST FAN.
<br />2018 WASHINGTON STATE ENERGY CODE
<br />NavalComolex�
<br />SYSTEMS ARE EXEMPT FROM THE COMMISSIONING PROCESS WHERE THE INSTALLED
<br />GENERAL CONTRACTOR TO PROVIDE ACCESS TO FIRE AND/OR
<br />TOTAL MECHANICAL EQUIPMENT CAPACTY IS LESS THAN 240,000 BTU/h COOLING
<br />COMBINATION FIRE/SMOKE DAMPERS.
<br />��
<br />CAPACITY AND LESS THAN 300,000 BTU/h HEATING CAPACITY,
<br />h29
<br />INSTALL ALL THERMOSTATS AT 48' AFF
<br />NOT
<br />TO SCALE
<br />VENTILATION CALCULATIONS
<br />THIS FORM APPLIES DEFAULT OCCUPANCY VENTILATION VALUES FROM ASHRAE 62.1 AND ASHRAE 170
<br />` INDICATES SIZING BASED ON MANUFACTURER'S RECOMMENDATIONS OR COOLING REQUIREMENTS OF EQUIPMENT IN SPACE
<br />BASIC CALCULATION = BREATHING ZONE AREA x (DEFAULT OCCUPANCY DENSITY/1000) x CFM/PERSON + BREATHING ZONE AREA x AREA OUTDOOR AIRFLOW RATE = MINIMUM OUTSIDE AIR REQUIRED OR
<br />(AREA x HEIGHT x # OF AIRCHANGES / HR) 160 MIN/HR = OSA OR AIR MOVEMENT REQUIRED
<br />AREA (SF)
<br />OR
<br />STANDARD 62.1
<br />62.1 AREA OUTDOOR
<br />62.1 DEFAULT
<br />STD 170
<br />REQUIRED AIR CHANGES
<br />62.1 MINIMUM
<br />VENTILATION
<br />DESIGN VENTILATION
<br />FIXTURES (#)
<br />(CFM/ PERSON)
<br />AIRFLOW RATE IN
<br />OCCUPANT
<br />(AIRCHANGE/HR)
<br />(CFM)
<br />(CFM)
<br />OR
<br />STANDARD 170
<br />BREATHING ZONE
<br />DENSITY
<br />ACTUAL # OF
<br />VENTILATION
<br />OSA
<br />SUP
<br />EXH
<br />OSA
<br />EXH
<br />OSA
<br />SUP
<br />EXH
<br />ROOM/ZONE
<br />OCCUPANCY CLASSIFICATION
<br />KVA
<br />(AIRCHANGE/HR)
<br />CFM/SOFT
<br />/1000SF
<br />OCCUPANTS
<br />SYSTEM
<br />Sound 2 Summit BOH-Kitchen
<br />KITCHEN
<br />457
<br />7.5
<br />0.12
<br />20
<br />-
<br />-
<br />-
<br />123
<br />320
<br />320
<br />320
<br />RTU-2
<br />Sound 2 Summit Service Counter
<br />KITCHENETTES
<br />232
<br />5.0
<br />0.06
<br />25
<br />-
<br />-
<br />-
<br />43
<br />70
<br />70
<br />320
<br />1 RTU-2
<br />Sound 2 Summit Restrooms
<br />RESTROOM
<br />1 4
<br />1 0.0
<br />0.00
<br />0
<br />-
<br />-
<br />-
<br />0
<br />200
<br />23
<br />200
<br />EF-1
<br />Sound 2 Summit Janitor
<br />JANITOR
<br />19
<br />1 0.0
<br />0.00
<br />0
<br />-
<br />-
<br />-
<br />0
<br />19
<br />-
<br />30
<br />EF-1
<br />Sound 2 Summit Dining
<br />DINING
<br />1623
<br />1 7.5
<br />0.18
<br />70
<br />90
<br />-
<br />-
<br />-
<br />967
<br />-
<br />967
<br />967
<br />RTU-3
<br />Sound 2 Summit Hall
<br />COR. OTHER
<br />106
<br />0.0
<br />0.06
<br />0
<br />-
<br />-
<br />-
<br />6
<br />-
<br />10
<br />-
<br />RTU-3
<br />Sound 2 Summit Office
<br />OFFICE
<br />75
<br />5.0
<br />0.06
<br />5
<br />-
<br />-
<br />-
<br />6
<br />-
<br />10
<br />-
<br />RTU-2
<br />NOTES
<br />1. UNLISTED SPACES DO NOT HAVE A MECHANICAL VENTILATION REQUIREMENT DUE TO ONE OR MORE OF THE FOLLOWING:
<br />A) THE SPACE IS AN UNOCCUPIED UNDER NORMAL USE. VENTILATION IS NOT REQUIRED PER 2018 WSMC 401.2.
<br />B) THE NONRETAIL STORAGE SPACE < 100 SOFT HAS NO MIN MECHANICAL VENTILATION REQUIREMENT PER 2018 WSMC TABLE 403.3.1.1
<br />C) THE SPACE IS NATURALLY VENTILATED VIA LOUVERS AND OPENINGS WITH A COMBINED FREE AREA OF AT LEAST 4 % OF THE SPACES FLOOR AREA PER 2018 WSMC 402.
<br />HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
<br />name
<br />oam12022
<br />N.—
<br />SOUND 2SUMMIT KITCHEN
<br />Floor, 151
<br />ENGINEERING CHECKS
<br />SYSTEM LOAD
<br />Number of5 tams
<br />Heroin 3 Y
<br />COIL
<br />CFM
<br />Total Room Loads
<br />Return Vented LlgMing
<br />Return All Ducts
<br />Return Fen41]
<br />Ventilation
<br />Supply Fan
<br />Supply Air Ducts
<br />TOTAL SYSTEM LOAD41971
<br />COOLING
<br />PEAK
<br />COIL HTG.
<br />PEAK
<br />Sensible
<br />Latent
<br />CFM
<br />9ansible
<br />Output per Syalem
<br />ut (,nun)
<br />]
<br />Out1Ot / X
<br />Coolin 3 Y
<br />47
<br />.0
<br />oY10 ut BIUWa
<br />oY10 u
<br />AllS tam
<br />HVAC EQUIPMENT SELECTION
<br />ow (nm)em
<br />ow (Mm/ M
<br />Oubitle A, (1)
<br />aYlde arinmre9nl
<br />'
<br />TOY, Adjusted slab Oatpm
<br />rAal�eraam.Faak pe.ip�Po�awo�:I
<br />TIME OF SYSTEM PEAK
<br />HEATINGSYSTEM _.HROMETRIC3
<br />AiraVeem Tem Y sal Time of Heroin Peak
<br />F 28°F®11 F
<br />e RODM
<br />COOLING SYSTEM PSYCHROMETICS Airstream Tem m at Time of CaallggilIn Peek
<br />uM a 821 e6® •tlJ�
<br />II 'BB'II
<br />476dm opwm,6pH���H 153-1
<br />.ROOM..
<br />741I6e°F
<br />HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
<br />I Hame
<br />Dam i 2022
<br />N.—
<br />SOUND 2SUMMIT DINING
<br />Roor
<br />1,622
<br />ENGINEERING CHECKS
<br />SYSTEM LOAD
<br />Nambar of S
<br />H-19 3 Y
<br />COIL
<br />CFM
<br />Total Room Loads 2
<br />Return Vented Llghting
<br />R—I, All Ducts
<br />Return Fen
<br />tf-ilation
<br />Supply Fan
<br />Supply All Ducts
<br />TOTAL SYSTEM LOAD
<br />COOLING
<br />PEAK
<br />COIL HTG.
<br />PEAK
<br />Sensible
<br />tAtem
<br />CFM
<br />Sensible
<br />ou tper System
<br />oYlO ut=)
<br />2�
<br />0 I BluM1ls
<br />Coolin 3 t
<br />J��
<br />erS mn
<br />Stuh)
<br />oral Om W X
<br />otN O
<br />AILS e
<br />HVAC EQUIPMENT SELECTION
<br />Alrflowlmnlem
<br />Affl— In a n)
<br />AH—j
<br />Ou di Ai %on
<br />om,Iae Nralmaan)
<br />Tatal Adjusted System Output
<br />taamsraa ro.Feak pasip�oo.amo�a)
<br />TIME OF SYSTEM PEAK
<br />HEATING SYSTEM PSYCHROMETRICS
<br />AiYImam Tem Y es at Time of Heatin
<br />Peak
<br />°F 46°F ®11 F
<br />380 �
<br />6 F
<br />ROOM
<br />7p 'F
<br />COOLING SYSTEM PSYCHROMETICS Airet Tem r et Time of CoolinglIPoek
<br />u66 F 79/
<br />2a6 arm 6pplln, 6p��
<br />86.4 % ROOM 55 r
<br />a
<br />�
<br />�
<br />o-
<br />Y
<br />K
<br />Q
<br />s
<br />N
<br />o
<br />cD
<br />G
<br />w
<br />0
<br />0
<br />0.
<br />z
<br />a
<br />o
<br />U
<br />N
<br />�
<br />o
<br />w
<br />�
<br />PLOT DATE 3/1/2023
<br />Z
<br />w
<br />m
<br />DESIGN DEVELOPMENT
<br />0
<br />DRAWING
<br />Z
<br />DATE
<br />_
<br />❑ COORDINATION
<br />z
<br />DATE
<br />■PERMIT
<br />rn
<br />DATE --
<br />CONSTRUCTION
<br />DATE
<br />AS BUILT
<br />DATE
<br />BUST/^y BUILDING DEPARTMENT STAMP
<br />Tin
<br />0
<br />946 V
<br />C'�F �FGISTER69
<br />ssrONAL EEO
<br />3/1/2023
<br />P:\Working Projects\Port Gardner —Sound 2 Summit —Design (222-0808) Const (223-0205)\Engineering\Sound 2 Summit\Sheets\MO.00 HVAC.dwg
<br />H—
<br />rn
<br />(n w
<br />z3
<br />0 arr
<br />3 0:
<br />0 0�
<br />z n
<br />0
<br />C )
<br />DO
<br />H Z
<br />w <
<br />J K
<br />F— U
<br />HVAC
<br />SCALE: AS —NOTED
<br />M0.00
<br />SOUND 2 SUMMITI