Laserfiche WebLink
TO SUMVJ <br />GENERAL INFORMATION <br />HVAC CONTRACTOR: <br />GENERAL MECHANICAL: <br />VICINITY MAP: <br />WSEC & COMMISSIONING NOTES: <br />PROPERTY TAX Ill <br />EMERALD AIRE INC <br />STANDARDS, <br />a <br />THERMOSTATS SHALL BE INTERLOCKED TO PREVENT SIMULTANEOUS HEATING AND <br />290518800400500 <br />5108 D STREET <br />EQUIPMENT AND MATERIALS SHALL CONFORM WITH APPROPRIATE <br />g <br />COOLING PER WSEC 403.2.4.1.1 <br />AUBURN, WA 98001 <br />PROVISIONS OF ARL, ASME, ASTM, UL, NEMA, ANSI, SMACNA, <br />LEGAL DESCRIPTION: <br />PROJECT MANAGER: <br />ASHRAE, MFPA, OTHER APPLICABLE AGENCIES AND AHJ AS <br />ECONOMIZERS SHALL MODULATE OUTSIDE AIR FROM MINIMUM TO 100% <br />SEC 18 TWP 29 RGE 05 LOT 1 OF PORT GARDNER LANDING <br />CONTACT, EMERALD AIRE, INC, <br />APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY <br />BSP REC VOL 2 OF BSPS PIG 108-109 AF NO 9609275005 <br />VOICEI(253) 872-5IRS <br />CODES, <br />-` <br />5 <br />ECONOMIZER CONTROLS SHALL BE CAPABLE OF EVALUATING OUTDOOR AIR COOLING <br />BEING A PTN OF SE j 182905 <br />FAX, (253) 872-565 <br />ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH <br />o <br />CAPACITY PER WSEC C403.3.1.1 <br />ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES AND <br />B <br />GENERAL CONTRACTOR: <br />ORDINANCES. IN CASE OF CONFLICT BETWEEN THE <br />p <br />INSULATE REFRIGERANT PIPING PER WSEC TABLE C403,2.8 <br />KIRTLEY COLE <br />DRAWINGS/SPECIFICATIONS AND THE CODES AND ORDINANCES, <br />PROJECT LOCATION: <br />2820 OAKES AVENUE <br />THE MOST STRICT STANDARD (IN THE OPINION OF THE <br />♦ <br />SEAL DUCTWORK PER WSEC C403.2.7.3 <br />1710 W MARINE VIEW DR, <br />SUITE B <br />ENGINEER) SHALL APPLY, THE MECHANICAL CONTRACTOR SHAL <br />'eMain <br />EVERETT, WA 98201 <br />SATISFY CODE REQUIREMENTS &REQUIREMENTS OF THE <br />a. a <br />INSULATE DUCTWORK PER WSEC C403.2.7. 1 AND C403.2.7.2 <br />EVERETT, WA 98021 <br />JAMES SCHWARTZ <br />CONTRACT DOCUMENTS AS A MINIMUM STANDARD, <br />5H S1 <br />JSCHWARTZ@KIRTLEY-COLE,COM <br />APPLICABLE CODES, <br />COMMISSIONING PER WSEC C408 INCLUDING COMMISSIONING PLAN, SYSTEMS <br />PROJECT DESCRIPTION: <br />�: s <br />BALANCING, FUNCTIONAL TESTING, CONTROLS TESTING, OPERATION AND <br />DUCT CONNECTION FROM INSTALLED ROOFTOP UNITS <br />2018 IMC W/WASHINGTON STATE AMENDMENTS,Z <br />3 a <br />MAINTENANCE MANUALS, AND RECORD DRAWINGS, SHALL BE SUBMITTED TO OWNER <br />(UNDER PERMIT # M2301-094), VENTILATION USING <br />2018 IBC W/WASHINGTON STATE AMENDMENTS <br />Puget Sound <br />ON PROJECT COMPLETION. PER 2018 WSEC C408.1 EXCEPTION 1, MECHANICAL <br />EXHAUST FAN. <br />2018 WASHINGTON STATE ENERGY CODE <br />NavalComolex� <br />SYSTEMS ARE EXEMPT FROM THE COMMISSIONING PROCESS WHERE THE INSTALLED <br />GENERAL CONTRACTOR TO PROVIDE ACCESS TO FIRE AND/OR <br />TOTAL MECHANICAL EQUIPMENT CAPACTY IS LESS THAN 240,000 BTU/h COOLING <br />COMBINATION FIRE/SMOKE DAMPERS. <br />�� <br />CAPACITY AND LESS THAN 300,000 BTU/h HEATING CAPACITY, <br />h29 <br />INSTALL ALL THERMOSTATS AT 48' AFF <br />NOT <br />TO SCALE <br />VENTILATION CALCULATIONS <br />THIS FORM APPLIES DEFAULT OCCUPANCY VENTILATION VALUES FROM ASHRAE 62.1 AND ASHRAE 170 <br />` INDICATES SIZING BASED ON MANUFACTURER'S RECOMMENDATIONS OR COOLING REQUIREMENTS OF EQUIPMENT IN SPACE <br />BASIC CALCULATION = BREATHING ZONE AREA x (DEFAULT OCCUPANCY DENSITY/1000) x CFM/PERSON + BREATHING ZONE AREA x AREA OUTDOOR AIRFLOW RATE = MINIMUM OUTSIDE AIR REQUIRED OR <br />(AREA x HEIGHT x # OF AIRCHANGES / HR) 160 MIN/HR = OSA OR AIR MOVEMENT REQUIRED <br />AREA (SF) <br />OR <br />STANDARD 62.1 <br />62.1 AREA OUTDOOR <br />62.1 DEFAULT <br />STD 170 <br />REQUIRED AIR CHANGES <br />62.1 MINIMUM <br />VENTILATION <br />DESIGN VENTILATION <br />FIXTURES (#) <br />(CFM/ PERSON) <br />AIRFLOW RATE IN <br />OCCUPANT <br />(AIRCHANGE/HR) <br />(CFM) <br />(CFM) <br />OR <br />STANDARD 170 <br />BREATHING ZONE <br />DENSITY <br />ACTUAL # OF <br />VENTILATION <br />OSA <br />SUP <br />EXH <br />OSA <br />EXH <br />OSA <br />SUP <br />EXH <br />ROOM/ZONE <br />OCCUPANCY CLASSIFICATION <br />KVA <br />(AIRCHANGE/HR) <br />CFM/SOFT <br />/1000SF <br />OCCUPANTS <br />SYSTEM <br />Sound 2 Summit BOH-Kitchen <br />KITCHEN <br />457 <br />7.5 <br />0.12 <br />20 <br />- <br />- <br />- <br />123 <br />320 <br />320 <br />320 <br />RTU-2 <br />Sound 2 Summit Service Counter <br />KITCHENETTES <br />232 <br />5.0 <br />0.06 <br />25 <br />- <br />- <br />- <br />43 <br />70 <br />70 <br />320 <br />1 RTU-2 <br />Sound 2 Summit Restrooms <br />RESTROOM <br />1 4 <br />1 0.0 <br />0.00 <br />0 <br />- <br />- <br />- <br />0 <br />200 <br />23 <br />200 <br />EF-1 <br />Sound 2 Summit Janitor <br />JANITOR <br />19 <br />1 0.0 <br />0.00 <br />0 <br />- <br />- <br />- <br />0 <br />19 <br />- <br />30 <br />EF-1 <br />Sound 2 Summit Dining <br />DINING <br />1623 <br />1 7.5 <br />0.18 <br />70 <br />90 <br />- <br />- <br />- <br />967 <br />- <br />967 <br />967 <br />RTU-3 <br />Sound 2 Summit Hall <br />COR. OTHER <br />106 <br />0.0 <br />0.06 <br />0 <br />- <br />- <br />- <br />6 <br />- <br />10 <br />- <br />RTU-3 <br />Sound 2 Summit Office <br />OFFICE <br />75 <br />5.0 <br />0.06 <br />5 <br />- <br />- <br />- <br />6 <br />- <br />10 <br />- <br />RTU-2 <br />NOTES <br />1. UNLISTED SPACES DO NOT HAVE A MECHANICAL VENTILATION REQUIREMENT DUE TO ONE OR MORE OF THE FOLLOWING: <br />A) THE SPACE IS AN UNOCCUPIED UNDER NORMAL USE. VENTILATION IS NOT REQUIRED PER 2018 WSMC 401.2. <br />B) THE NONRETAIL STORAGE SPACE < 100 SOFT HAS NO MIN MECHANICAL VENTILATION REQUIREMENT PER 2018 WSMC TABLE 403.3.1.1 <br />C) THE SPACE IS NATURALLY VENTILATED VIA LOUVERS AND OPENINGS WITH A COMBINED FREE AREA OF AT LEAST 4 % OF THE SPACES FLOOR AREA PER 2018 WSMC 402. <br />HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY <br />name <br />oam12022 <br />N.— <br />SOUND 2SUMMIT KITCHEN <br />Floor, 151 <br />ENGINEERING CHECKS <br />SYSTEM LOAD <br />Number of5 tams <br />Heroin 3 Y <br />COIL <br />CFM <br />Total Room Loads <br />Return Vented LlgMing <br />Return All Ducts <br />Return Fen41] <br />Ventilation <br />Supply Fan <br />Supply Air Ducts <br />TOTAL SYSTEM LOAD41971 <br />COOLING <br />PEAK <br />COIL HTG. <br />PEAK <br />Sensible <br />Latent <br />CFM <br />9ansible <br />Output per Syalem <br />ut (,nun) <br />] <br />Out1Ot / X <br />Coolin 3 Y <br />47 <br />.0 <br />oY10 ut BIUWa <br />oY10 u <br />AllS tam <br />HVAC EQUIPMENT SELECTION <br />ow (nm)em <br />ow (Mm/ M <br />Oubitle A, (1) <br />aYlde arinmre9nl <br />' <br />TOY, Adjusted slab Oatpm <br />rAal�eraam.Faak pe.ip�Po�awo�:I <br />TIME OF SYSTEM PEAK <br />HEATINGSYSTEM _.HROMETRIC3 <br />AiraVeem Tem Y sal Time of Heroin Peak <br />F 28°F®11 F <br />e RODM <br />COOLING SYSTEM PSYCHROMETICS Airstream Tem m at Time of CaallggilIn Peek <br />uM a 821 e6® •tlJ� <br />II 'BB'II <br />476dm opwm,6pH���H 153-1 <br />.ROOM.. <br />741I6e°F <br />HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY <br />I Hame <br />Dam i 2022 <br />N.— <br />SOUND 2SUMMIT DINING <br />Roor <br />1,622 <br />ENGINEERING CHECKS <br />SYSTEM LOAD <br />Nambar of S <br />H-19 3 Y <br />COIL <br />CFM <br />Total Room Loads 2 <br />Return Vented Llghting <br />R—I, All Ducts <br />Return Fen <br />tf-ilation <br />Supply Fan <br />Supply All Ducts <br />TOTAL SYSTEM LOAD <br />COOLING <br />PEAK <br />COIL HTG. <br />PEAK <br />Sensible <br />tAtem <br />CFM <br />Sensible <br />ou tper System <br />oYlO ut=) <br />2� <br />0 I BluM1ls <br />Coolin 3 t <br />J�� <br />erS mn <br />Stuh) <br />oral Om W X <br />otN O <br />AILS e <br />HVAC EQUIPMENT SELECTION <br />Alrflowlmnlem <br />Affl— In a n) <br />AH—j <br />Ou di Ai %on <br />om,Iae Nralmaan) <br />Tatal Adjusted System Output <br />taamsraa ro.Feak pasip�oo.amo�a) <br />TIME OF SYSTEM PEAK <br />HEATING SYSTEM PSYCHROMETRICS <br />AiYImam Tem Y es at Time of Heatin <br />Peak <br />°F 46°F ®11 F <br />380 � <br />6 F <br />ROOM <br />7p 'F <br />COOLING SYSTEM PSYCHROMETICS Airet Tem r et Time of CoolinglIPoek <br />u66 F 79/ <br />2a6 arm 6pplln, 6p�� <br />86.4 % ROOM 55 r <br />a <br />� <br />� <br />o- <br />Y <br />K <br />Q <br />s <br />N <br />o <br />cD <br />G <br />w <br />0 <br />0 <br />0. <br />z <br />a <br />o <br />U <br />N <br />� <br />o <br />w <br />� <br />PLOT DATE 3/1/2023 <br />Z <br />w <br />m <br />DESIGN DEVELOPMENT <br />0 <br />DRAWING <br />Z <br />DATE <br />_ <br />❑ COORDINATION <br />z <br />DATE <br />■PERMIT <br />rn <br />DATE -- <br />CONSTRUCTION <br />DATE <br />AS BUILT <br />DATE <br />BUST/^y BUILDING DEPARTMENT STAMP <br />Tin <br />0 <br />946 V <br />C'�F �FGISTER69 <br />ssrONAL EEO <br />3/1/2023 <br />P:\Working Projects\Port Gardner —Sound 2 Summit —Design (222-0808) Const (223-0205)\Engineering\Sound 2 Summit\Sheets\MO.00 HVAC.dwg <br />H— <br />rn <br />(n w <br />z3 <br />0 arr <br />3 0: <br />0 0� <br />z n <br />0 <br />C ) <br />DO <br />H Z <br />w < <br />J K <br />F— U <br />HVAC <br />SCALE: AS —NOTED <br />M0.00 <br />SOUND 2 SUMMITI <br />