My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2217 MCDOUGALL AVE 2023-11-01
>
Address Records
>
MCDOUGALL AVE
>
2217
>
2217 MCDOUGALL AVE 2023-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 9:46:40 AM
Creation date
9/12/2023 7:54:12 AM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
2217
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/4/2022 V Page 1 l <br />,,rr City of Everett <br />6:40:40AM <br />INSPECTION ACTIVITY REPORT <br />Permit No. B2107-060 Site Address 2217 MCDOUGALL AVE <br />Applied 7/23/2021 Applicant ELIZABETH CLAY Lot <br />Approved 8/12/2021 Owner LAMB LAND LLC Block <br />Issued 8/25/2021 Contractor J L REMODELING INC Tract <br />Parent Permit No. W2105-017 Description INT REMODEL OF EXTG SFR: REMOVE BATHROOM & INFIL <br />Notes OPENING. NEW: (2) REMODELED BATHROOMS AND KITCHENS"Expose all unapproved work <br />(including electrical, mechanical, plumbing, and framing systems etc.) installed/altered without permits <br />and inspection approval" <br />Scheduled ComDieted TVDe Inspector Result Remarks Inspector's Comments <br />12/7/2021 12/7/2021 BLDG 15-OTHER KMK NOT READY SITE READINESS (12/3/2021 7:35 AM CRB) <br />CHECK SITE READINESS CHECK - RYAN W/JL <br />REMODELING 425-422-7163--12-2PM <br />12/21/2021 12/21/2021 <br />1/10/2022 1/10/2022 <br />1/10/2022 1/10/2022 <br />BLDG 15-OTHER KMK <br />BLDG KMK <br />08-FRAMING <br />BLDG KMK <br />12-INSULATION <br />(12/7/2021 3:31 PM KMK) <br />Expose all work necessary for inspection <br />(12/7/2021 3:31 PM KMK) <br />Expose all work for inspection <br />NOT READY see notes (12/15/2021 1:52 PM CRB) <br />Good morning Cindy, <br />We are all ready for our # 2 site readiness <br />check. Can we please get scheduled ASAP. <br />I'm really trying to get this project finished <br />so the owner can move back into there <br />home. Thanks so much. <br />Anna Parker <br />Director of Operations & HR <br />JL Remodeling, Inc. <br />Office 1 425-493-4742 <br />Cell 1 206-351-1471 <br />www. jlremodelingcom <br />(12/21/2021 10:27 AM KMK) <br />1. Complete rough in inspections for <br />plumbing, mechanical, plumber electrical <br />2. Air seal/fire caulk at all exposed top and <br />bottom plates and as discussed <br />Reschedule for framing inspection when the <br />above has been completed <br />NO ACCESS 10 am 1/7/2022 11:35 AM Jeff Laurence <br />Contact Name: Ryan Sims <br />Site Address: 2217 MCDOUGALL AVE <br />Phone:4254227163 <br />e-Mail: ryan@jlremodelingcom <br />(1/10/2022 10:13 AM KMK) <br />If you need a 2 hour window for inspection <br />please call the building department between <br />730 and 8:30 AM on day of inspection. <br />NO ACCESS 10 am 1/7/2022 11:35 AM Jeff Laurence <br />Contact Name: Ryan Sims <br />Site Address: 2217 MCDOUGALL AVE <br />Phone:4254227163 <br />e-Mail: ryan@jlremodelingcom <br />(1/10/2022 10:13 AM KMK) <br />If you need a 2 hour window for inspection <br />please call the building department between <br />730 and 8:30 AM on day of inspection. <br />INSP12 C YSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.