My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech, Inc. 9/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
TranTech, Inc. 9/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:14:28 PM
Creation date
9/12/2023 3:12:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech, Inc.
Approval Date
9/11/2023
Council Approval Date
8/30/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
EPIC Bridge – Type, Size and Location Study
Tracking Number
0003925
Total Compensation
$856,998.74
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br /> PROFESSIONAL SERVICES AGREEMENT <br />This Professional Services Agreement (“Agreement”) is effective as of the date of the <br />Mayor’s signature below and is between the City of Everett, a Washington municipal corporation <br />(the “City”), and the person identified as Service Provider in the Basic Provisions below (“Service <br />Provider”). This Agreement is for the purpose of the Service Provider providing services to the <br />City as set forth in the Agreement. This Agreement includes and incorporates the Basic <br />Provisions, the attached General Provisions, the attached scope of work (Exhibit A), and the <br />attached method of compensation (Exhibit B). <br />BASIC PROVISIONS <br />Service Provider <br />TranTech Engineering, LLC <br />365 118th Ave. SE <br />Bellevue, WA 98005 <br />Knikzad@trantecheng.com <br />City Project Manager <br />Tom Hood <br />City of Everett – Public Works 3200 Cedar Strett <br />Everett WA 98201 <br />thood@everettwa.gov <br />Brief Summary of Scope of Work Completion of a Type, Size, and Location (TS&L) Study for the EPIC Green Bridge <br />Completion Date December 31, 2024 <br />Maximum Compensation Amount $856,998.74.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.