My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech, Inc. 9/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
TranTech, Inc. 9/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:14:28 PM
Creation date
9/12/2023 3:12:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech, Inc.
Approval Date
9/11/2023
Council Approval Date
8/30/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
EPIC Bridge – Type, Size and Location Study
Tracking Number
0003925
Total Compensation
$856,998.74
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
# <br />Exhibit - Prime Consultant Cost Computation <br />2.6626 <br />Principal Engineer-QA/QCProject ManagerSenior Structural EngineerProject Structural EngineerStaff Structural Engineer 2Construction ManagerSenior CAD TechnicianAdministrative 2Total <br />Hours <br /> Direct Labor <br />Cost <br />Total Cost Per <br />Work Element <br />Direct Rate 89 89 84.5 75 53.95 94.5 50 48 <br />Work Element 1 - Project Management 16,328.00$ 43,474.93$ <br />1.1.1 Monthly Progress Reports and Invoicing 12 24 36 2,220.00$ <br />1.1.2 Design Team Management 100 40 140 10,820.00$ <br />1.1.3 Meetings 24 24 48 3,288.00$ <br />0 -$ <br />Work Element 10 - Structural Design 91,520.00$ 243,681.15$ <br />0 -$ <br />TS&L Report 100 120 240 240 240 80 240 24 0 91,520.00$ <br />0 -$ <br />0 -$ <br />Total Staff Hours 100 256 240 240 240 80 240 112 224 <br />Total Direct Labor Cost $8,900.00 $22,784.00 $20,280.00 $18,000.00 $12,948.00 $7,560.00 $12,000.00 $5,376.00 107,848.00$ 287,156.08$ <br />Reimbursable Expenses Subtotal (Labor)107,848.00$ <br />Overhead @ 136.26%146,953.68$ <br />Fee @ 30.00%32,354.40$ <br />Travel expenses (mileage)360 $0.655 235.80$ <br />Printing 12 $44.000 528.00$ <br />-$ Reimbursable Expenses 763.80$ <br />-$ <br />-$ <br />Total Reimbursable Expenses $ 763.80 287,919.88$ <br />Notes: <br />1 Rates shown reflect the typical compensation rate of employees assigned to the billing category listed. <br />Each category may have multiple employees assigned to that billing category and each employee <br />may have a different hourly rate of pay. Invoices will show employee's actual RAW labor rates, per contract Payment Provisions. <br />2 Classifications shown are for estimating purposes and not all-inclusive; the actual invoice will show our employee's specific labor classification. <br />Grand Total: <br />Project multiplier: <br />Item Units <br />Cost per <br />Unit Total Cost <br />City of Everett <br />Everett Point Industrial Center (EPIC) Bridge Project <br />TranTech Engineering, LLC <br /># <br />Exhibit B
The URL can be used to link to this page
Your browser does not support the video tag.