Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2207-073 Description: PV SOLAR ROOF MOUNT INSTALLATION,7.03kW <br /> Applied:7/26/2022 Approved:7/26/2022 Site Address:3502 ROCKEFELLER AVE <br /> Issued:8/9/2022 Finaled:9/13/2023 City,State Zip Code:EVERETT,WA 98201-4728 <br /> Status: FINALED Applicant: INGRID LOMERA <br /> Parent Permit: Owner: DUNNIHOO STEPHANIE ANNE <br /> Parent Project: Contractor:SOLGEN POWER(CONST) LLC <br /> Details: <br /> **MANUFACTURER SPEC TO BE ONSITE FOR BLDG INSPECTOR TO REFER TO** <br /> PV SOLAR ROOF MOUNT INSTALLATION,7.03kW <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PERMIT EXTENSION EXTENSION <br /> 3/2/2023 3/2/2023 (REASON Unassigned APPROVED <br /> REQUIRED) <br /> Notes: <br /> From:Permitting<permitting@solgenpower.com> <br /> Sent:Wednesday,March 1,2023 9:44 AM <br /> To: Engineering/Public Services(PW)<evteps@everettwa.gov> <br /> Subject:[EXTERNAL]Solgen Power,LLC-3502 Rockefeller Ave Everett,WA98201 <br /> CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the <br /> content is safe. <br /> Building permit#:B2207-073 <br /> Good morning, <br /> I hope this email finds you well.It has come to our attention that the permit referenced above has expired.We had a delay in the project,we are now <br /> ready to move forward with inspections. Is it possible to get an extension?Please let us know if anything additional is needed.Thank you! <br /> With appreciation, <br /> Becky Silva <br /> Solgen Power,LLC/Permitting Administrative Team <br /> (509)394-4099 <br /> 7/31/2023 7/31/2023 BLDG 16-FINAL Matt Schreifels CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 7/26/2023 2:47 PM SOLGEN POWER(CONST)LLC <br /> homeowners phone#(425)773-8526 <br /> Contact Name:Stephanie Dunnihoo <br /> Site Address:3502 ROCKEFELLER AVE <br /> Phone:8557091181 <br /> e-Mail:stephanie.dunnihoo@seattlechildrens.org <br /> Seismic upgrades to the rafters were not installed per the approved plans and retrofit letter from Engineer. Install seismic upgrade as proposed and <br /> I <br /> Printed:Wednesday, 13 September, 2023 1 of 2 rk <br /> SUPERION <br />