My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2825 COLBY AVE COLBY CENTER 2026-01-02
>
Address Records
>
COLBY AVE
>
2825
>
COLBY CENTER
>
2825 COLBY AVE COLBY CENTER 2026-01-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2026 2:35:27 PM
Creation date
9/13/2023 7:10:33 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2825
Tenant Name
COLBY CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY Or EVERETT <br /> EVERETT OFFICE USE ONLY <br /> WAS LiINGTON Permit Services Transmittal D ' D <br /> PERMIT/PROJECT#: <br /> M2305-031 UN Z A 2023 <br /> SITE ADDRESS: 2825 Colby Ave. Everett WA 98213 CITY OF EVERETT <br /> PROJECT NAME: Skotdal - Colby Center- Split Replacements P rmit Services <br /> FROM: Ammone Bembry COMPANY: MacDonald Miller Facility Solutions hI Chronology—Permit Counter Transmittal <br /> 206-768-4062 permits@macmiller.com '� Plan Review Routing <br /> PHONE#: EMAIL: Location: ❑File —Reviewer Office <br /> Date Logged By: <br /> Route to: (Check all that apply) Name of Reviewer Type of Review <br /> ❑� Planning Reviewer Name:JEssicAJAavi ❑ Re-Review <br /> ❑ Public Works Reviewer Name: ❑ Revisions After Approval <br /> ❑� Building Reviewer Name:jamesBronder ❑� Revisions After Issuance <br /> ❑ Fire Reviewer Name: ❑ Other <br /> Other Reviewer Name: ❑ Other <br /> Provide quantities for all items submitted <br /> PLANS REPORTS/CALCULATIONS OTHER DOCUMENTS <br /> Qty Qty Qty <br /> Arch./Bldg. Plans _ Geotechnical Report _ Co i I ection Letter Responses <br /> Structural Plans _ Drainage Report _ Draft Easement <br /> Civil Plans _ SWPPP Report _ Reclorded Easement <br /> _ Site Plan _ Wetland Report _ Height Survey <br /> Landscape Plan _ Critical Area Report _ Basl Elevation Survey <br /> _ Survey _ Traffic Study/TDM Report _ Critical Area Covenant <br /> _ Elevations _ Structural Calculations _ Stormwater Covenant <br /> Floor Plans _ Height Calculations _ Co Tenant-Other <br /> Special Inspection Report _ Plumbing Calculations _ Performance Guarantee <br /> _ As-Builts Other _ Warranty Bond <br /> Plat Maps Other <br /> 2 Other Revision Project Narrative <br /> _ _ <br /> Original City Redlines Returned Other 2 Other Equipment Submittals <br /> 2 Other Revised Mechanical Plan Set _ Other _ Other <br /> Other Other _ Other <br /> Items submitted are: Revised plan set <br /> ❑ Complete Plan Replacement Sets 0 Revised Plan Sheets ❑■ Additional Documents <br /> (Applicant to slip-sheet at counter) (AdId to file) <br /> Comments to Reviewer:Addition to scope: Install (2) new cooling-only split systems in condos without <br /> existing cooling. Revision 1 clouds on TF0.01 , TF2.04, 12.05, and TF3.01 . <br /> " 06/29/20231 " " ` � n � <br /> Signed: Ammone BelY <br /> Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.