My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1415 OAKES AVE 2023-09-14
>
Address Records
>
OAKES AVE
>
1415
>
1415 OAKES AVE 2023-09-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 1:40:51 PM
Creation date
9/13/2023 9:45:56 AM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
1415
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) 10 AWG THHN/THWN-2,CU.BLACK(ll) 23.0 A AC (1) 10 AWG THHN/THWN-2,CU.,BLACK(LI) MAX 13 3 A A (1) 10-2 OF-B(or NM)W/G.THHN/THV/N-7,50 MAX 13.3 A A (1) 12}2 TC-ER,THHN/THWN-2,CU MAX 13.3 A AC <br /> 15 (1) 10 AWG THHNftHWN-2,CU.,RED(L2) 240 V AC 3 (1) 10 AWG THHN/THWN•2.CU.,RED(L 2) 240 V A 2 240 V A 1 (1) 6 AWG BARE.CU(EGO 240 V AC <br /> (1) 10 AWG THHN/THWN-2,CU.,WHITE(N) (1) 10 AWG THHN/TH"-2,CU.,GREEN(EGC) <br /> (1) 10 AWG THHNfTHWN-2,CU.,GREEN(EGC) <br /> 1 3/4 INCH EMT EXTERIOR 1) 3/4 INCH EMT EXTERIOR INTERIOR EXTERIOR BLUE RAVEN <br /> (1) 10 AWG THHN/THWN-2,CU.,BLACK(ll) 9 7 A AC <br /> 4 (1) 10 AWG THHN/THWN-2,CU.,RED(1.2) 240 V AC <br /> (1) 10 AWG THHN/THWN-2,CU„GREEN(EGG) <br /> 1403 N. Research Way <br /> (1) 1 INCH SCM 80PVC EXTERIOR Orem, UT 84097 <br /> 800.377.4480 <br /> W W W.BLUERAVENSOLAR.COM <br /> DESIGNER NOTES: ELECTRICAL NOTES: CONFIDENTIAL-THE INFORMATION <br /> HEREIN CONTAINED SHALL NOT BE <br /> LOAD SIDE BREAKER IN LEFT MSP,INTERIOR POI ALL INTERIOR CONDUIT MUST BE SCH 80 PVC. USED FOR THE BENEFIT OF ANYONE <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> SHALL IT BE DISCLOSED IN WHOLE OR <br /> 19 QCeIIs Q.PEAK DUO BLK ML-G10+ 395 IN RECIPIENTS <br /> TT ORGANIZATION, <br /> EXCEPT( ) RECIPIENTS ORGANIZATION,EXCEPT <br /> UL 1703 COMPLIANT IN CONNECTION WITH THE SALE AND <br /> (E)200A MAIN SERVICE PANEL ENPHASE IQ COMBINER 4 (19) ENPHASE IQ8PLUS-72-2-US USE OF THE RESPECTIVE EQUIPMENT, <br /> (E)200A/2P MAIN BREAKER (SOLAR LOADS ONLY) JUNCTION BOX OPTIONAL UL 1741 COMPLIANT WITHOUT THE WRITTEN PERMISSION <br /> IF OF-B CABLE USED 4"x4"x4"PVC JB-1 EZ SOLAR OF BLUE RAVEN SOLAR LLC. <br /> PV AC DISCONNECT FOR ENTIRE HOMERUN JUNCTION BOX JUNCTION BOX <br /> (E)200A/2P NON-FUSED (N)20A/2P <br /> L1 LOCKABLE,VISIBLE OPEN a JB a JB-1 11 _ (1)CIRCUIT OF <br /> L2 30A,240V,2-POLE Lz L2 L2 NABCEP <br /> N EGC ________________ ♦__ EGC ♦___ EGG __ = 11 MODULES <br /> (E)LOADS *PV BREAKER TO BE LOCATED ENVOY AC DISCONNECT <br /> AT OPPOSITE END OF BUSSING 1�A/2P 30A NON-FUSED CERTIFIED] <br /> 3 2 1 <br /> FROM MAIN BREAKER N PV INSTALLATION <br /> (N)30A/2P L, PV CIRCUIT(S)ON DETACHED STRUCTURE PROFESSIONAL <br /> Ll <br /> Nz PF N2 v` Scott Gurney <br /> F <br /> EGC --------------------------- ------ ECC-- (N)20A/2P u Ll , JB �Ll JB-1 a #PV-011719-015866 <br /> -------------------- <br /> G L2 L2 L2 8 MODULES CONTRACTOR: <br /> 120/240 VAC N I 15 EGC ----- EGC ■--- EG_C ■--- EGC - <br /> 60HZ i 1s --- 7 s 7 BRS FIELD OPS <br /> 1 PHASE <br /> TO UTILITY _j 4 4 3 2 1 800-377-4480 <br /> GRID I <br /> G J *JUNCON <br /> BUD <br /> OPTIONAL <br /> IF UF <br /> FOR ENTIRE HOMERUN <br /> TRENCHING _ <br /> 55FT THROUGH DIRT — (� <br /> I SCHEDULE 80 PVC CONDUIT (N)%"COPPER GROUND ROD, U <br /> I <br /> r , 20"DEEP 8'LONG,MIN. <br /> I I GEC INSTALLED PER NEC Z O <br /> 250.64:6 OR 4 AWG SOLID O N3 Y <br /> (E)GROUNDING = (N)%"COPPER GROUND ROD, COPPER GEC. CD _�e L0 <br /> ELECTRODE(S) — 8'LONG,MIN.U FROM(E) 0-)GROUNDING CONDUCTOR. E REQUIRED,VERIFICATION WILL DONE TQ C LO C)Lr) <br /> IF REQUIRED,VERIFICATION WILL BE DONE TO ENSURE THE GROUNDING ELECTRODE SYSTEM IS CC <br /> ENSURE THE GROUNDING ELECTRODE SYSTEM IS GEC INSTALLED PER NEC CONGRUENT WITH CURRENT REQUIREMENTS.(NEC G � L0 <br /> CONGRUENT WITH CURRENT REQUIREMENTS.(NEC 250.64:6 OR 4 AWG SOLID 250 PART III)IF NOT,A NEW GROUND ROD WILL BE 0) <br /> 250 PART III)IF NOT,A NEW GROUND ROD WILL BE COPPER GEC. INSTALLED. O W C Uj� N N <br /> INSTALLED. . UL <br /> U) U) <br /> ' 0 000LU >_ >_ <br /> Cl) L LO W fn fn <br /> ` <br /> :3 '1"- <br /> ao <br /> ii Ole \ DRAWING BY: <br /> PremiumCAD <br /> ►, <br /> PLOT DATE: <br /> .�, • 'r December 21 , 2022 <br /> INTERCONNECTION NOTES '' r; �-�, I PROJECT NUMBER: <br /> 705.12(8)(3)THE FOLLOWING METHOD(S)SHALL BE USED TO .. 674019 <br /> DETERMINE THE RATINGS OF BUSBARS: (2)WHERE TWO SOURCES, 117�bi� <br /> ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER ` <br /> �_rr <br /> SHEET NAME: <br /> SOURCE,ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT <br /> CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE _ ELECTRICAL <br /> POWER-SOURCE(S)OUTPUT CIRCUIT CURRENT AND THE RATING OF <br /> THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT REVISION: PAGE NUMBER: <br /> EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR. UTILITY COMPANY: Snohomish County Public Utilities District (PUD) PERMIT ISSUER: City of Everett 0 PV5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.