Laserfiche WebLink
• • <br /> jeffrey@precise-hvac.com <br /> From: Drew Martin <dmartin@everettwa.gov> <br /> Sent: Monday, February 27, 2023 1:49 PM <br /> To: permits@precise-hvac.com <br /> Subject: City of Everett Permit Services: 10521 19th Avenue SE (M2302-007) - First Building <br /> Review <br /> Hello,Jeffrey. <br /> We have completed the first review of the building plans for this project. This email will serve as the review letter. The <br /> comments below should be addressed. Two revised full-sized hard-copies of the drawings should be submitted for <br /> review. An itemized response letter stating how each comment has been addressed should be included with the <br /> drawing. Additional revised documentation, including but not limited structural calculations and other supporting <br /> documentation, should be submitted as required. <br /> Comments <br /> 1. The proposed work includes suspended equipment exceeding 20 lbs. This equipment requires <br /> independent support and seismic bracing. Details should be included in the drawings. Calculations <br /> substantiating the design should be submitted for review. The design should comply with ASCE 7-16 <br /> Chapter 13. See IBC Section 1613.1. <br /> 2. The proposed work includes one or four rooftop units each weighing 1,627 lbs. The following comments should <br /> be addressed: <br /> a. Calculations evaluating the strength of the roof structure supporting the units in addition to existing <br /> loads (e.g., self-weight, snow, etc.), including but not limited to joists and supporting beams and <br /> columns, should be submitted for review. See IBC Section 1604.1 and 1604.4. <br /> b. Details for the installation of the units should be submitted for review. <br /> c. Continuing with the previous comment, an additional Building permit application must be submitted if <br /> structural modifications are required. Minor modifications such as penetrations through and blocking of <br /> the roof sheathing to create small duct openings may be included in the Mechanical permit <br /> details. Note that if a Building permit application is required,the Mechanical permit cannot be issued <br /> until the Building permit is approved. <br /> Please contact me if you have questions. Thank you. <br /> Drew Martin, P.E.,S.E. <br /> iiii <br /> - Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm—3 pm;Tu: 1:O0pm-3:O0pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br />