Laserfiche WebLink
ra, <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 3/2/2023 3/2/2023 BLDG 01- KURT KECK OTHER eTRAKiT Inspection Request <br /> CONSULTATION <br /> Notes: <br /> 2/28/2023 1:16 PM Pat McDonnell <br /> FIRE-01 I assume is a Pre-construction consultation? <br /> Contact Name:Pat McDonnell <br /> Site Address:,15909 19th Ave NE Arlington WA 98223 <br /> Phone:4258905087 <br /> e-Mail:patmcdonnell@hstconstruction.com <br /> Discussed inspection process <br /> 3/23/2023 3/23/2023 BLDG 08-FRAMING KURT KECK CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 3/20/2023 12:30 PM Pat McDonnell <br /> We are on site till 1:30PM M-F <br /> Contact Name:Pat McDonnell <br /> Site Address:,15909 19th Ave NE Arlington WA 98223 <br /> Phone:4258905087 <br /> e-Mail:patmcdonnell@hstconstruction.com <br /> Obtain plumbing rough in approval. <br /> 5/4/2023 5/4/2023 BLDG 13-CEILING RAKEEB KHAN APPROVAL eTRAKiT Inspection Request <br /> GRID <br /> Notes: <br /> 4/25/2023 12:17 PM Pat McDonnell <br /> Contact Name:Pat McDonnell <br /> Site Address:,15909 19th Ave NE Arlington WA 98223 <br /> Phone:4258905087 <br /> e-Mail:patmcdonnell@hstconstruction.com <br /> 5/9/2023 5/9/2023 TEMP CERTIFICATE RAKEEB KHAN NOT READY eTRAKiT Inspection Request <br /> OF OCCUPANCY <br /> Notes: <br /> 5/3/2023 2:55 PM Pat McDonnell <br /> Contact Name: Pat McDonnell <br /> Site Address:,15909 19th Ave NE Arlington WA 98223 <br /> Phone:4258905087 <br /> e-Mail:patmcdonnell@hstconstruction.com <br /> Need all life safety approved <br /> Printed:Wednesday, 13 September,2023 C__)2of4. <br /> Ek <br /> SUPERION <br />