Laserfiche WebLink
YCD24 <br /> r <br /> 49EW 200 AMP PANEL BY <br /> NEW HALLWAY GS HEATING <br /> RETURN, y ❑ Elv..' h <br /> TM9V040A10.VENT O T <br /> ROOF <br /> Install York YCD24 AC on back side of house under <br /> the bathroom windpw.Route power from panel to AC <br /> through cr wlspace.Route refrigeration lines in <br /> crawlspace to furnace.Install York TM9V 95%2 Stage <br /> furnace with 4"media filter and Pro8000 Wifi <br /> Thermostat. Install new PVC venting out the roof. <br /> Install new return from furnace mechanical closet to <br /> hallway outside of mechanical room. Provide new <br /> Reme Halo LED air scrubber and clean all ductwork. <br />