My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/09/13 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/09/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:29:33 AM
Creation date
9/14/2023 11:23:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />17 <br />• Drilling will be accomplished during daylight and workday hours. Boring locations are accessible <br />by truck- or truck-mounted drill rigs. <br />• The geotechnical scope of services includes borehole decommissioning. <br />• The budgeted effort in Amendment 1 does not include remedial design effort for contaminated <br />soils handling beyond limited disposal under 10 cubic yards and capping with site paving. <br />• Coring and sampling activities will be coordinated with site demolition work. Demolition <br />contractor will make arrangement for coring and sampling activities. <br />• Additional site investigations to inform design of the Conveyance Option pipelines and pressure <br />manholes in the right of way along the eastern site boundary will be in ACE Conveyance <br />Agreement. <br />Everett Responsibilities <br />• Provides site access for geotechnical investigations and field work. <br />• Review updated preliminary Geotechnical Engineering Report at intermediate design and final <br />design. Provide review comments to BC for transmittal to HWA GeoSciences and incorporation <br />into the final report. <br />Meetings <br />• BC and HWA GeoScience meetings including but not limited to: <br />− Intermediate design kick-off <br />− Final design kick-off <br />− General coordination meetings through intermediate and final design. <br />• Workshop attendance and City check in meetings on an as-needed basis. Workshops may <br />include: <br />− Intermediate Design Review Workshop <br />− Final Design Review Workshop <br />Work Products <br />• Updated Geotechnical Data Report, draft and final. <br />• Updated Preliminary Geotechnical Engineering Report, draft at Intermediate Design, final at Final <br />Design. <br />• Project specifications for the intermediate (60%), final (90%), and Bid Document design gates. <br />• Field memoranda (during construction). <br />• Special inspection reports for pile driving. <br />• Final inspection report. <br />• Submittal review comments and RFI responses (as applicable).
The URL can be used to link to this page
Your browser does not support the video tag.