Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />37 <br />• Change items number and design effort is an estimate and may not reflect actual number of <br />items or effort. CO metrics will be reviewed monthly and included in the monthly progress report. <br />• Reissuance of contract drawings may be required for select change issues to communicate <br />design intent at Engineer’s discretion. Contractor’s record drawings will incorporate contract <br />change designs and record information. City’s 3rd Party CM will check Contractor’s redline record <br />drawings include this information. <br />• BC will review and comment on change order pricing, but price negotiation for Change Orders will <br />be by City’s 3rd Party CM. <br />Everett Responsibilities <br />• Prepare Change Orders (COs), including processing and tracking, <br />• Review and comment on Contractor’s change order proposals content and pricing. <br />• Include executed change orders with equitable adjustment in Contractor pay requests. <br />• Provide research materials and field access to respond to change requests, as required, as <br />governed by the Contract. <br />• Host ad-hoc meetings related to change issues. <br />Meetings <br />• Allowance of up to 100, 1-hour ad-hoc meetings related to change issues. <br />Work Products <br />• Contract change design content, including sketches, photos, pdf markups and reissued Contract <br />Drawings to communicate changes to the Contract Documents. <br />Task 700 – Startup and Testing <br />Objective: Assist City’s CM with Contractor’s testing and commissioning activities. Verify results of <br />start-up tests meet performance criteria in the Contract Documents. Document start-up and testing <br />activities for construction record. Assist with programming start-up in an advisory and review <br />capacity. <br />Activities/Approach: This task includes the following activities: <br />• Review Contractor’s startup and testing submittals. <br />• Witness testing and commissioning activities, including approving procedures and results prior <br />proceeding with subsequent testing phases. <br />• Coordinate discipline engineering assistance with start-up activities when needed (Utilities, <br />Electrical, Instrumentation and Controls, Building Mechanical (HVAC), Process Mechanical). <br />• Provide feedback to PLC and SCADA programmer on the implementation of the process control <br />descriptions to confirm design intent is achieved. <br />• Assist with desktop and on-site review of operator interface screens (OIT terminals and HMI <br />screens) with City operations and staff and programmer. Document requested changes and add <br />items as necessary to programming corrective work items list. <br />Task Assumptions <br />• No factory or off-site testing will be witnessed by the Engineer in the Storage Facility Package. <br />• Contractor will provide a separate HVAC systems commissioning agent/firm under the <br />construction contract. <br />Everett Responsibilities