Laserfiche WebLink
NEW PHOTOVOLTAIC SYSTEM 16.810kW DC / 14.309kW AC CONTRACTOR INFORMATION <br /> 5102 SEAHURST AVENUE, EVERETT, WA 98203 <br /> SUNERGYsYsT s <br /> Employee Owned N <br /> AHJ SCOPE OF WORK VICINITY MAP <br /> (N) 16.810kW DC / 14.309kW AC ROOF MOUNT PV SYSTEM r = SUNERGY SYSTEMS INC. <br /> WA-CITY OF EVERETT (41) REC SOLAR REC410AA PURE (410W) MODULES <br /> (41) ENPHASE IQ8A-72-2-US (240V) MICROINVERTERS NORTHWEST, SEATTLE,ADDRESS: 4546 LEARY WAY <br /> AY <br /> 98107 <br /> UTILITY (1) ENPHASE IQ COMBINER 4 <br /> 5mStSri PHONE NUMBER: (206) 302-9464 <br /> SNOHOMISH COUNTY PUD NO 1LICENSE NUMBER: SUNERSI905D4 <br /> a, stst scsw - <br /> CODES AND STANDARDS • CUSTOMER INFORMATION <br /> ELECTRIC CODE: NEC 2020 NAME: KELLY MANEMAN <br /> FIRE CODE: IFC 2018 <br /> Elna Sf <br /> BUILDING CODE: IBC 2018 _ ADDRESS: 5102 SEAHURST AVENUE, <br /> RESIDENTIAL CODE: IRC 20185t EVERETT, WA 98203 <br /> 52nd <br /> WIND SPEED: 110 MPH <br /> SNOW LOAD: 30 PSF COORDINATES: 47.950630, <br /> -122.243756 <br /> APN: 00581100100000 <br /> 16.810kW DC / 14.309kW AC ROOF <br /> MOUNT PV SYSTEM <br /> GENERAL NOTES SHEET CATALOG <br /> 1.MODULES ARE LISTED UNDER UL 1703/ UL 61730 AND 10.PV ARRAY COMBINER/JUNCTION BOX PROVIDES <br /> CONFORM TO THE STANDARDS. TRANSITION FROM ARRAY WIRING TO CONDUIT PV-1 COVER SHEET <br /> 2.INVERTERS ARE LISTED UNDER UL 1741 AND CONFORM WIRING. <br /> TO THE STANDARDS. 11.RACKING SYSTEM SHALL BE LISTED TO UL 2703. PV-2 SITE PLAN <br /> 3.DRAWINGS ARE DIAGRAMMATIC, INDICATING GENERAL 125IRE RATING OF EXISTING ROOF ASSEMBLY SHALL PV-3 MOUNTING DETAILS <br /> ARRANGEMENT OF THE PV SYSTEM. ACTUAL SITE BE MAINTAINED WITH ADDITIONAL OF PHOTOVOLTAIC <br /> CONDITIONS MAY VARY. SYSTEM. PV-3.1 STRUCTURAL DETAILS <br /> 4.WORKING CLEARANCES AROUND THE NEW PV PV-4 SINGLE LINE DIAGRAM <br /> ELECTRICAL EQUIPMENT SHALL BE MAINTAINED IN <br /> ACCORDANCE WITH NEC 110.26. PV-4.1 ELECTRICAL CALCULATIONS <br /> 5.ALL GROUND WIRING CONNECTED TO THE MAIN PV-5 PLACARDS <br /> SERVICE GROUNDING IN MAIN SERVICE PANEL/ SERVICE SS SPEC SHEETS <br /> EQUIPMENT. <br /> 6.ALL CONDUCTORS SHALL BE 600V, 90°C STANDARD <br /> COPPER UNLESS OTHERWISE NOTED. <br /> 7.WHEN REQUIRED, A LADDER SHALL BE IN PLACE FOR <br /> INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. <br /> &THE SYSTEM WILL NOT BE INTERCONNECTED BY THE PROJECT ID AUR-83774 <br /> CONTRACTOR UNTIL APPROVAL FROM UTILITY IS <br /> RECEIVED. DATE 8/18/2023 <br /> 9.ROOF ACCESS POINT SHALL BE LOCATED IN AREAS <br /> THAT DO NOT REQUIRE THE PLACEMENT OF GROUND CREATED BY SSB <br /> LADDERS OVER OPENINGS SUCH AS WINDOWS OR <br /> DOORS, AND LOCATED AT STRONG POINTS OF BUILDING SIGNATURE <br /> CONSTRUCTION WHERE THE ACCESS POINT DOES NOT <br /> CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS COVER SHEET <br /> TREES, WIRES OR SIGNS. PV-1 <br />