Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />2/23/2021 Any <br />2/23/2021 <br />ELEC 02-GROUND <br />I STEVE BANKS <br />PARTIAL <br />eTRAKiT Inspection Request <br />WORK <br />APPROVAL <br />Notes: <br />2/19/2021 10:01 AM EXPRESS ELECTRIC INC <br />Secondary conduits ditch cover - please contact Grant with any questions @360-746-5129 <br />Contact Name: EXPRESS ELECTRIC INC <br />Site Address: 2701 ROCKEFELLER AVE <br />Phone:3606710113 <br />e-Mail: expressadmin@expresselectric.com <br />2/18/2021 3:49 PM EXPRESS ELECTRIC INC <br />secondary conduits ditch cover - please call Grant with any questions @360-746-5129 <br />Contact Name: EXPRESS ELECTRIC INC <br />Site Address: 2701 ROCKEFELLER AVE <br />Phone:3606710113 <br />e-Mail: expressadmin@expresselectric.com <br />(Canceled - eTRAKiT - 2/19/2021 10:00:10 AM) <br />(2/23/2021 11:40 AM SKB) <br />OK secondary from vault towards building 6 feet. OK temp secondary to stub ups about 15'. <br />2/23/2021 <br />2/23/2021 <br />ELEC 04 <br />STEVE BANKS <br />PARTIAL <br />GROUNDING <br />APPROVAL <br />Notes: <br />Two rods stubbed up at temporary service location. <br />4/15/2021 <br />4/15/2021 <br />ELEC 06 ROUGH IN <br />STEVE BANKS <br />PARTIAL <br />L-1 PT Deck <br />APPROVAL <br />Notes: <br />4/14/2021 3:47 PM EXPRESS ELECTRIC INC <br />1st floor pt deck north cover. Call Grant @ 360-746-5129 with any questions <br />Contact Name: EXPRESS ELECTRIC INC <br />Site Address: 2701 ROCKEFELLER AVE <br />Phone:3606710113 <br />e-Mail: expressadmin@expresselectric.com <br />(4/15/2021 2:43 PM SKB) <br />North half of level 1 PT Deck <br />4/27/2021 <br />4/27/2021 <br />ELEC 03- <br />STEVE BANKS <br />PARTIAL <br />eTRAKiT Inspection Request <br />SLAB/CONDUIT <br />APPROVAL <br />Notes: <br />4/26/2021 11:14 AM EXPRESS ELECTRIC INC <br />AM requested. Cover on south half of 1st floor pt deck ent conduit. <br />Contact Name: GRANT TJOELKER <br />Site Address: 2701 ROCKEFELLER AVE <br />Phone:3607465129 <br />e-Mail: expressadmin@expresselectric.com <br />(4/27/2021 10:32 AM SKB) <br />skb changed Inspection Type from ELEC 06-ROUGH IN to ELEC 03-SLAB/CONDUIT <br />(4/27/2021 10:39 AM SKB) <br />OK south half of PT one. <br />I <br />Printed: Tuesday, 19 September, 2023 2 of 14 rk <br />SUPERION <br />