Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />12/8/2021 <br />12/8/2021 <br />PLUMB 03-ROUGH <br />JASON <br />PARTIAL <br />eTRAKiT Inspection Request <br />IN <br />MORRISSEY <br />APPROVAL <br />Notes: <br />12/7/2021 6:55 AM jeff gerard <br />L-8 rough in units <br />site contact Reuben 425-240-8804 <br />Contact Name: jeff gerard <br />Site Address: 2701 ROCKEFELLER AVE <br />Phone:2064274578 <br />e-Mail: jeffg@owpllc.net <br />(12/8/2021 1:01 PM JJM) <br />DWV ok floor 5 - 8 grids A - F and 1 -9. <br />Water ok floor 8 grids A - F and 1- 9. <br />12/16/2021 <br />12/16/2021 <br />PLUMB 03-ROUGH <br />JASON <br />PARTIAL <br />eTRAKiT Inspection Request <br />IN <br />MORRISSEY <br />APPROVAL <br />Notes: <br />12/13/2021 10:00 AM jeff gerard <br />Rough in L-8 units water partial <br />DWV L-5 to L-8 partial <br />Contact Name: Reuben Reed <br />Site Address: 2701 ROCKEFELLER AVE <br />Phone:4252408804 <br />e-Mail: jeffg@owpllc.net <br />(12/16/2021 1:17 PM JJM) <br />DWV ok floors 5 - 8 and grid lines 1 - 9 and F - K <br />Water lines ok level 8 and grid lines F - K <br />1/4/2022 <br />1/4/2022 <br />GAS 01-ROUGH IN <br />JASON <br />PARTIAL <br />MORRISSEY <br />APPROVAL <br />Notes: <br />Gas test ok. Level 2 to roof. Branch lines to RTU's not ready yet. <br />Gas test ok. Level 2 to boiler room. <br />I <br />Printed: Tuesday, 19 September, 2023 2 of 10 rk <br />SUPERION <br />