My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1929 75TH ST SE 2024-01-16
>
Address Records
>
75TH ST SE
>
1929
>
1929 75TH ST SE 2024-01-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2024 9:09:17 AM
Creation date
9/19/2023 11:29:01 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
1929
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />8/10/2023 <br />8/10/2023 <br />BLDG 16-FINAL <br />RAKEEB KHAN <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />Notes: <br />8/4/2023 11:48 AM Revolution Solar <br />Inspections for solar panels. Please call customer 1 hour prior to arriving for ETA of access. <br />Contact Name: Corrine Shearer <br />Site Address: 1929 75TH ST SE <br />Phone:4257602964 <br />e-Mail: permits.wa@revolutionsolar.com <br />Inspected from the ground. Used another connection from panel to metal roof. Plans specify s-5! clamps but they were not used. Connections drill <br />though metal roof. See attachments for picture. Provide letter from engineer for approval of change. <br />8/16/2023 <br />8/16/2023 <br />BLDG 16-FINAL <br />RAKEEB KHAN <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />Notes: <br />8/15/2023 10:40 AM Revolution Solar <br />Inspections for solar panels. Please call customer 1 hour prior to arriving for ETA of access. <br />Contact Name: Corrine Shearer <br />Site Address: 1929 75TH ST SE <br />Phone:4257602964 <br />e-Mail: permits.wa@revolutionsolar.com <br />Upload stamped approved engineering regarding changes to connections. Provided plans were not engineer stamped. <br />9/12/2023 <br />9/12/2023 <br />BLDG 16-FINALI <br />RAKEEB KHAN <br />JAPPRVD-PERMIT <br />I eTRAKiT Inspection Request <br />FINAL <br />Notes: <br />9/5/2023 11:24 AM Revolution Solar <br />Inspections for solar panels. Please call customer 1 hour prior to arriving for ETA of access. <br />Contact Name: Corrine Shearer <br />Site Address: 1929 75TH ST SE <br />Phone:4257602964 <br />e-Mail: permits.wa@revolutionsolar.com <br />See attached updated stamped engineer drawings. <br />9/13/2023 <br />CERTIFICATE OF <br />permit Technician <br />OCCUPANCY <br />Notes: <br />�A_ <br />Printed: Wednesday, 13 September, 2023 2 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.