Laserfiche WebLink
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />8/10/2023 <br />8/10/2023 <br />BLDG 16-FINAL <br />RAKEEB KHAN <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />Notes: <br />8/4/2023 11:48 AM Revolution Solar <br />Inspections for solar panels. Please call customer 1 hour prior to arriving for ETA of access. <br />Contact Name: Corrine Shearer <br />Site Address: 1929 75TH ST SE <br />Phone:4257602964 <br />e-Mail: permits.wa@revolutionsolar.com <br />Inspected from the ground. Used another connection from panel to metal roof. Plans specify s-5! clamps but they were not used. Connections drill <br />though metal roof. See attachments for picture. Provide letter from engineer for approval of change. <br />8/16/2023 <br />8/16/2023 <br />BLDG 16-FINAL <br />RAKEEB KHAN <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />Notes: <br />8/15/2023 10:40 AM Revolution Solar <br />Inspections for solar panels. Please call customer 1 hour prior to arriving for ETA of access. <br />Contact Name: Corrine Shearer <br />Site Address: 1929 75TH ST SE <br />Phone:4257602964 <br />e-Mail: permits.wa@revolutionsolar.com <br />Upload stamped approved engineering regarding changes to connections. Provided plans were not engineer stamped. <br />9/12/2023 <br />9/12/2023 <br />BLDG 16-FINALI <br />RAKEEB KHAN <br />JAPPRVD-PERMIT <br />I eTRAKiT Inspection Request <br />FINAL <br />Notes: <br />9/5/2023 11:24 AM Revolution Solar <br />Inspections for solar panels. Please call customer 1 hour prior to arriving for ETA of access. <br />Contact Name: Corrine Shearer <br />Site Address: 1929 75TH ST SE <br />Phone:4257602964 <br />e-Mail: permits.wa@revolutionsolar.com <br />See attached updated stamped engineer drawings. <br />9/13/2023 <br />CERTIFICATE OF <br />permit Technician <br />OCCUPANCY <br />Notes: <br />�A_ <br />Printed: Wednesday, 13 September, 2023 2 of 2 rk <br />SUPERION <br />