Laserfiche WebLink
POST PER PLAN <br /> BC POST BASE <br /> (E) SHEATHING > <br /> (E) BOTTOM PLATE <br /> t29 t25.1 <br /> (E) RIM JOIST > <br /> II <br /> SOLID WOOD BLKG. I '� <br /> UNDER POST TO <br /> MATCH POST SIZE (E) FLOOR JOIST <br /> BUILT-UP STUD POST TO <br /> (2) 0.131" 0 X 3" NAILS MACH POST SIZE ABOVE <br /> TOP & BOTTOM NAIL BUILT-UP STUDS w/ <br /> 0.131" 0X3" NAILS @8" O.C. <br /> WOOD POST AT EXTERIOR WALL0/ <br /> CJ <br /> Rafdal House Renovation 7/14/22 22337.01 <br /> project date job no. <br /> U_- 2PDAVENJE MKS <br /> SEA 1 drawn by: <br /> WA 98. <br /> TEL 2069673900 Matt Rafdal <br /> MKS <br /> QUANTUM FAX 20e9t73901 <br /> _ s s u ,,c s-s s www.auartumee.ear client design by: sheet no. <br />