Laserfiche WebLink
(E) SHEATHING OR GWB <br />(WHERE OCCURS) POST PER PLAN <br />BC POST BASE <br />SOLID WOOD BLKG. <br />UNDER POST TO (E) BOTTOM PLATE <br />MATCH POST SIZE <br />A (2) 0.131" O X 3" NAILS TOP <br />(E) FLOOR JOIST — A34 EACH SIDE OF BLKG. <br />r-� <br />- ------- ------ ------------------ -------- <br />(-J .4 �:§ <br />3" 6", TYP. 1'-0" 2'-0" MIN. <br />3" <br />3'-0" MIN. VERIFY (E) 6x6 P/T POST <br />OR ADD 4x4 P/T POST <br />4x12 DF#1 BOLTED TO (E) BEAM UNDER BEAM ABUTTING <br />w/ (2) ROWS OF 3/4" 0 A307 (E) 4x4 POST w/ 1/4" Ox6" <br />THRU BOLTS, STAGGERED SDS SCREWS @ 6" O.C. <br />(E) FOOTING <br />WOOD POST AT INTERIOR WALL <br />Rafdal House Renovation <br />project <br />1511 THIRD AVENUE <br />SUITE 323 <br />SEATTLE, WA 98101 <br />TEL 206.957.3900 Matt Rafdal <br />QUANTUM FAX 206.957.3901 <br />CONSULTING ENGINEERS wwv.quantumce.com client <br />D - REV1 <br />10/6/22 <br />date <br />MKS <br />drawn by: <br />MKS <br />22337.01 <br />job no. <br />design by: sheet no. <br />