My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2918 VICTOR PL 2023-10-19
>
Address Records
>
VICTOR PL
>
2918
>
2918 VICTOR PL 2023-10-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 9:40:48 AM
Creation date
9/22/2023 6:20:44 AM
Metadata
Fields
Template:
Address Document
Street Name
VICTOR PL
Street Number
2918
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (13)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (400W) <br /> (13)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:5.200 kWDC <br /> ,N SOLAR BONDING CONNECTION GROUND PATHS " ■ .;; SM SOLAR ENDCLAMP, FIRST MODULE : ■ AC SYSTEM SIZE:3.900kWAC <br /> ■� MOUNT INSTALLATION GUIDE PAGE ■■ MOUNT INSTALLATION GUIDE PAGE <br /> - <br /> ------_-------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> REVISIONS <br /> /1 Aro `_t HGE�� O © © DESCRIPTION DATE REV <br /> i <br /> 110.1lrAq-� OG(FF,4gMF © gpP S�RPrSS-OFA N 1 tel.' All <br /> r4 \ pRE '1100'. 0oaD1HG Teo ..�-. <br /> ONO/NCT c'J r1ft GNpPO� � ra <br /> al - BoU _ 11 �ayN � \ 0do <br /> PROJECT NAME&ADDRESS <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp into <br /> Bonding Hardware creates bond between sol,[, ©Seratrd flange no removes Lfoot enodirahon clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to <br /> ®Aluminum mid clamp with stainless steel bonding pins that pierce module frame Q bar and each rad Semon to bond LFoot to stemless steel T-bolt Q <br /> anodization to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side of bracket as shown.Do W <br /> y�Aluminum splice ba+spans across rail gap to Serrated T-bolt head penetrates ail anodization <br /> V create rad to rail bond.Rail on at least one Side grounded rails.The clamp should be installed on the with the top slot of the rails. engages with end of rail not force clamp into rail by pushing <br /> Stainless steel nut bonds aluminum clamp to stainless steel T-bolt m bond T-Dolt.nut,and L-root ro <br /> dspllce wnl be grounded SM rail rails prior to installing end modules. boU is extended as far as possiule End clamps are positioned on on bolt with excessive force. .- <br /> Serrated T-bolt head penetrates fail anodization to bond T-bolt,nut,clamp,and - so that clamp is positioned at max, rails prior to the first end <br /> modules to SM rail O <br /> distance from end of rail, module and prior to the Last N <br /> end module. 00 <br /> CS) O <br /> p jt E Q Goo <br /> .. hF uuTAllrAirtve 2 ''{{ . < o <br /> WCa wasr.R - - Ot. -- , /rT O <br /> 4— ` a— BONDING ' sJa�� _ o'Dgq 0 �LLJJ W �O <br /> E p B neon >✓E���� wigF s� 1 . o z W o <br /> A a <br /> Snum BONDING BONDING RAIL �\��0 -- 1 �'\ Q W Lo <br /> OUND �.7 MICROINVERTER SPLICE BA0. ©' LLI <br /> LO <br /> ♦ MOUNT - - - W o <br /> / – WEEBLUG(OR ILSCO LUG) /® Y �J,J <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with d <br /> Hex no with capula'tock washes DWWs metal WEER washer dimles piece snodlred fait to Install the first end module For best appearance, Z <br /> (� v flange in full contact with rail,rotate end damp bolt until <br /> I T�microinvrrter flange to rainless steel T-Doll `-a creme Dard between earl and lugposition module Rush O <br /> BONDING MiDCLAMP Seonto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails Q <br /> 4 to DordT-Dolt-nul and L-loot to grounded <br /> rrated T-bult head penetrates —dilation- — Solid[upper mre[onneaedto lug isromedto the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more 1 <br /> A ,C SM w;l.1-11, <br /> . ,. ,,, „I ©provide final system ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as �s than 1R'beyond module. _U <br /> nw,m.,,.ryr,eh,rveu un®f, ter- l'iT:,c..:�q,,,n.l.z ce,�:,nr.:e:-,law 1 Module must be fully <br /> rte n,n <br /> es nRto of rails. impact actg / <br /> ion of driver begins. supported by rails and \\ <br /> RAILTO LFOOT <br /> l° - d apgw.a m,ndrwartar.strnr•'w pater l N OT <br /> w/80-IIDlNG 7-BOLT "9'4 -iii QUE VALUE(See t.. �. :'.•; ��;,1�-:0� '. � cannot overhang ends 00 <br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails. <br /> 0-) <br /> N <br /> DATE: 11/15/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.